Similar Projects
Tate + Gate Cultural Arts Center
New Construction - 20,000 SF
Conception
Greensboro, NC 27403

Taylor Theatre Infrastructure Renovation
Renovation
Conception
Greensboro, NC

Construction Manager-at-Risk - New Student Recreation and Wellness Center
New Construction, Alteration - 217,000 SF
Bidding
$90,000,000 est. value
Greensboro, NC 27411

RFP Construction Manager-at-Risk - Carver Hall Comprehensive Modernization - Phases 1 and 2
Renovation - 56,000 SF
Bidding
$20,100,000 est. value
Greensboro, NC 27405

AV NC A&T State University Engineering Research & Innovation Complex
New Construction - 130,000 SF
Post-Bid
$90,000,000 est. value
Greensboro, NC 27401

Central Energy Plant - East
New Construction - 431 SF
Post-Bid
$800,000 est. value
Jamestown, NC 27282

North Carolina Agricultural and Technical State University Carver Hall Rooms 2nd Level Up-Fit
Results
Greensboro, NC

UNCG Athletics Coleman Building Weight Room Renovation
Renovation
Results
Greensboro, NC

New Welcome Center
New Construction - 2,456 SF
Construction
$500,000 to $1,000,000 CJ est. value
High Point, NC

Murphy Hall Restroom Renovations at A and T State University
Renovation - 39,000 SF
Bidding
$300,000 est. value
Greensboro, NC 27401

IDIQ MATOC for Healthcare and Medical Research Laboratory Facility Design Build Construction, In Support of The Defense Health Agency (DHA) Sustainment, Restoration and Modernization Program
New Construction
Post-Bid

Carver Hall Elevator Addition
New Construction, Renovation - 950 SF
Results
$515,000 est. value
Greensboro, NC 27400

Renovations of Women's Basketball Shower Room
Renovation
Post-Bid
Greensboro, NC 27401

Carver Hall Lab Upgrades
Results
Greensboro, NC 27405

Gtcc Sears At Building Renovations
Renovation - 6,501 SF
Post-Bid
Jamestown, NC 27282

Last Updated 05/25/2022 12:26 AM
Project Title

Relocate Hines Lab 207 to Cherry 201

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27411   (Guilford County)
Category(s) Education, Laboratory
Sub-Category(s) College/University, Laboratory
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Relocate Hines Lab 207 to Cherry 201 project will be constructed on NCA&T's main campus in Greensboro, NC. The project will be a renovation of existing rooms Hines Hall and Cherry Hall. The project will include the removal and relocation of two (2) existing benchtop islands from lab 207 in Hines Hall to lab 201 in Cherry Hall. Both benchtop islands have two (2) built-in lab sinks which will require new hot water, cold water, sanitary and vent piping. Additionally, an existing fume hood located in Hines Hall, lab 200, will be removed and relocated to Cherry Hall Lab 201. The fume hood will require new cold water, sanitary and vent piping. Also, a new exhaust fan serving the fume hood will be installed on the roof. Stainless steel duct will be routed up, through the third floor, to the location of the exhaust fan on the roof. A new chase will be constructed on the third floor to enclose the stainless-steel exhaust duct. The electrical scope includes providing power for the new exhaust fan and the relocated fume hood. Selective demolition of existing lights and receptacles will also take place in Cherry 201. New light fixtures will be provided in Cherry 201.

Details

College/University, Renovation, Laboratory, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents