Similar Projects
Panera Bread / Roseville
New Construction, Infrastructure - 4,150 SF
Conception
$1,300,000 CJ est. value
Roseville, MN 55113

Bruce Vento School Replacement - Saint Paul Public Schools
New Construction, Demolition
Conception
$20,000,000 est. value
Saint Paul, MN 55130

Maplewood Assisted Living
New Construction, Infrastructure - 17,233 SF
Design
$4,600,000 CJ est. value
Maplewood, MN 55109

Spring Break - 80-Themed Restaurant and Bar / St. Paul
New Construction, Infrastructure
Design
$935,000 CJ est. value
Saint Paul, MN 55101

Plato \ Lafayette Sewer Cleaning & TV Inspection
Infrastructure
Bidding
$400,000 CJ est. value
Saint Paul, MN 55107

Hause Park Court Reconstruction Project
Infrastructure
Bidding
$300,000 CJ est. value
North Saint Paul, MN 55109

Otter Lake Elementary
Renovation, Addition
Post-Bid
White Bear Lake, MN

Brimhall Elementary School LTFM
Renovation
Post-Bid
Roseville, MN 55113

Lakeaires Elementary Addition and Renovation
Renovation, Addition
Results
White Bear Lake, MN 55110

Birch Lake Elementary
Renovation, Addition
Results
White Bear Lake, MN

Twin Lakes Station Demolition and Sitework
Demolition, Infrastructure
Construction
Roseville, MN 55113

Metro Gold Line Bus Rapid Transit (GBRT)
New Construction, Infrastructure
Construction
$247,954,230 CJ est. value
Saint Paul, MN 55101

Riversedge - Phase 2
New Construction, Infrastructure
Pending Verification
$220,000,000 CJ est. value
Saint Paul, MN 55102

Rice Creek Commons
New Construction, Infrastructure - 1,400,000 SF
Pending Verification
$750,000,000 CJ est. value
Arden Hills, MN 55112

Signal Replacement - TH 35E
Infrastructure
Conception
$800,000 CJ est. value
Little Canada, MN 55117

Last Updated 03/07/2023 03:40 PM
Project Title

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Jie Ming - South Lot

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55116   (Ramsey County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Jie Ming Mandarin Immersion Addition and Renovation - Part 2 project includes the addition of approximately 20,000 SF of new construction, including a new cafeteria and kitchen and five new classrooms. A portion of the addition is designed to serve as a severe weather storm shelter. The project also includes replacing one boiler in the original building mechanical room and the full HVAC system in the 1950s era portion of the building. One set of inclusive restrooms will be added, and the existing gym floor will be replaced. Traffic areas including for buses, cars, and service vehicles will be reconfigured. Direct any communications to the Architect electronically. If you have a question regarding this or need immediate attention, please contact: Administrator: Gwenn Balzer, Host: ARC Central - Minnesota, Address: 4730 Park Glen Road, , St. Louis Park, Phone: 952-697-8800, Fax: 952-697-8803, Email: minnesota@e-arc.com Bid Security in the amount of 5% of the total bid amount (in the form of a bid bond or cashier's check) is required for bids totaling $175,000 or more. Electronically submitted bids require a copy of the bid security to accompany submission. Original cashier's check bid security must be delivered within three (3) business days of bid opening or postmarked on or before bid opening date. The Owner intends to recommend award of Contract on March 21, 2023. 1. Contact the Printer in advance to order the documents or order on-line. 2. Make checks payable to ARC Central. 3. Documents may be picked up by bidders directly from the Printer. 4. If delivery of the documents is requested, charges shall be paid by the Bidder directly to the Printer. 5. The Owner will provide One PDF set of documents to the successful bidder(s). Additional sets may be purchased by the Contractor. Questions and clarifications should be presented during the pre-bid meeting or in writing to the buyer no later than February 24, 2023 at 2 p.m. All responses to questions and clarifications will be done in the form of addenda to be posted no later than end of day February 28, 2023.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents