Similar Projects
Reported | 01/19/2022 12:00 AM |
Project Title | SEPTA Platforms Improvements - General |
Physical Address | View project details and contacts |
City, State (County) | Philadelphia, PA 19153 (Philadelphia County) |
Category(s) | Transportation |
Sub-Category(s) | Airline/Passenger Terminal |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | Greater than $5,000,000 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The PHL SEPTA Platform Improvements Project, located at the Philadelphia International Airport, consists of (includes but is not limited to) the following major items of work: 1. Concrete platform floor repair and finish at Center and North Platforms. 2. Vertical concrete surface finish at North Platforms. 3. Concrete column and girder finish at Center Platforms. 4. Platform tactile warning edge replacement at Center and North Platforms. 5. Glazed aluminum curtainwall replacement at Center Platform Vestibules, except Platform A. 6. Roof replacement at Center Platforms. 7. Roof drains replacement at Center Platforms. 8. Polycarbonate panel replacement at North Platforms. 9. Aluminum composite panels, Bird exclusion, for steel girders and beams at North platforms. 10. Exterior metal ceiling replacement at Center Platforms. 11. Interior Metal ceiling replacement at Center Platform Vestibules, except Platform A. 12. Epoxy floor finish replacement at North Platform Waiting Rooms. 13. Roof access at Center Platforms. 14. PHL sign frame replacement with means to eliminating bird perching. 15. Demolition of existing power-operated doors at North Platform Waiting Room A, B and C. 16. HVAC replacement and new control system at North Platform Waiting Rooms A, B and C. 17. Lighting fixture replacement to LED lighting at Center and North Platforms. 18. Speaker replacement at Center and North Platforms. 19. Rainwater conductor pipe replacement at Center Platforms. 20. Rainwater conductor heat trace and insulation at Center Platforms. 21. HVAC replacement at Center and North Platform Vertical Circulation Cores (VCCs) and North Platform Waiting Rooms. 22. Fin-tube heaters at Center and North Platform Vertical Circulation Cores (VCCs). 23. Air Curtain / Door Heaters at Center and North Platform Vertical Circulation Cores (VCCs). 24. Coordination with all existing street furniture, equipment, and utilities for installation of the Work. 25. Temporary construction barriers. 26. The Contractor shall provide all labor, material, equipment and services for the complete, proper installation and operation of the work as indicated, required or implied by the drawings and as specified herein. |
||||||||||||||||||||||||||||||||||||||||||||
Details | Airline/Passenger Terminal, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |