Similar Projects
SEP Horizon Three Phase Variable Shunt Reactor
New Construction
Bidding
Colorado Springs, CO

Airport Substation Power Control Assembly
New Construction
Bidding
Loveland, CO

Construction Services for The Second Controllable Grid Interface (CGI) Project at The NREL Flatirons Campus
New Construction
Post-Bid
Boulder, CO

Request For Information: Steel Structures for Western Area Power Administration (WAPA)
New Construction, Term Contract
Post-Bid

Midway KV1A Replacement
New Construction
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

AULT-Badwater-North Cody Equipment Install
Results
$1,000,000 to $5,000,000 est. value
CO

Design-Build of "Eastside" Distribution Substation
Term Contract
Construction
Fountain, CO 80817

Rattlesnake Solar - Hudson
New Construction
Construction
Hudson, CO

Shunt Reactor for Hayden Substation
Term Contract
Post-Bid
Hayden, CO

Cardnell Substation Construction - Installation
Results
Glenwood Springs, CO 81601

CMAFS Substation
Renovation
Post-Bid
Colorado Springs, CO 80926

Horseshoe Electrical Substation Improvement Project
Results
Loveland, CO 80537

Transformer T3 Replacement Timberline Substation
Renovation
Post-Bid
Fort Collins, CO

Horseshoe Electric Substation Improvement
Results
Loveland, CO 80537

Strontia Springs PRV Station Improvements
Renovation
Post-Bid
Aurora, CO

Last Updated 12/23/2021 02:56 AM
Project Title

Eaton Secondary Unit Substation

Physical Address View project details and contacts
City, State (County) Pueblo, CO 81003   (Pueblo County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 to $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Material or equipment or services to be purchased Eaton Secondary Unit Substation. Equipment specified to be installed under this section shall be erected and placed in proper operating condition in full conformity with Drawings, Specifications, engineering data, instructions, and recommendations of the equipment manufacturer.

Details

Electric Substation, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents