Similar Projects
Fire Station 70
New Construction
Conception
$1,580,000 est. value
Phoenix, AZ 85029

Fire Station No. 8
New Construction - 14,150 SF
Conception
$14,251,320 est. value
Peoria, AZ

Fire Station 62
New Construction
Bidding
$6,200,000 est. value
Phoenix, AZ

Construction Manager at Risk Police Evidence Facility
New Construction - 36,000 SF
Bidding
$10,000,000 to $15,000,000 est. value
Mesa, AZ

Police Dispatch Center Expansion (CMAR)
Renovation - 10,600 SF
Post-Bid
Gilbert, AZ

Police Dispatch Center Expansion (PM/CM)
Renovation - 10,600 SF
Post-Bid
Gilbert, AZ

CMAR - Fire Station No. 2
Results
$58,712 est. value
Queen Creek, AZ 85142

Construction Manager at Risk (CMAR) Fire Station No. 5
Results
$56,490 est. value
Queen Creek, AZ 85142

Chandler Heights Substation Wellness Center
Renovation
Conception
$495,000 est. value
Chandler, AZ

Construction Manager at Risk (CMAR) Services for Fire Station 282 Reconstruction
Renovation
Post-Bid
Chandler, AZ

Construction Manager at Risk for Project 26 Replace Deteriorating Vehicle Training Track
New Construction, Renovation
Results
$19,000,000 est. value
Tempe, AZ 85281

Fire Station 9
New Construction - 14,000 SF
Conception
$16,721,200 est. value
Surprise, AZ 85378

Fire Station Design Services
New Construction - 19,000 SF
Results
Avondale, AZ 85323

CMAR and Construction Administration Services of A Fire Station
Results
Avondale, AZ 85323

Permanent Fire Station CMAR
New Construction - 19,000 SF
Results
Avondale, AZ

Last Updated 08/06/2021 10:17 AM
Project Title

Mesa Family Advocacy Center MFAC Building Improvements

Physical Address View project details and contacts
City, State (County) Mesa, AZ   (Maricopa County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,830,000 to $2,165,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to complete a major renovation of approximately 28,500 square feet of two (2) Police Department (PD) buildings at 225 North First Street. Multiple PD units are located at this facility including the Mesa Family Advocacy Center (MFAC) unit. The scope of this project includes: 1. Replacement of the existing HVAC systems with new Variable Refrigerant Flow (VRF) HVAC units, add outside-air volume, new ductwork for supply air and return air. 2. Electrical system improvements that include upgrading the existing service entrance section (SES), replacement of electrical panels and various distribution changes. 3. Replacement of the existing drop ceilings (28,500 SF). 4. Replacement of the existing ceiling lighting with LED fixtures. 5. Replacement of the existing carpeting. 6. Tenant improvements of the existing space (10,600 SF). 7. New shower and locker facilities for staff using the onsite workout room. 8. Correct various ADA doorway clearance issues. 9. Correct spacing on the existing safety railing. Project Location is in 222 North 1st Street.

Details

Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents