Similar Projects
Cubesmart and Fire Station
New Construction, Build-Out - 97,367 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Oakland Park, FL 33334

New City Hall Complex & Westside Fire Station No. 2
New Construction
Conception
Less than $5,700,000 est. value
Lake City, FL 32055

Fire Station 11
New Construction
Design
Orlando, FL

Orlando Fire Station 6
New Construction
Design
Orlando, FL

Fire Station No. 2
New Construction
Bidding
Fernandina Beach, FL

Reserve Apparatus Garage for Fire Station No. 81
New Construction
Bidding
DeLand, FL 32720

Town of Windermere Town Facilities
New Construction - 9,882 SF
Post-Bid
$5,200,000 est. value
Windermere, FL

New Police Department
New Construction - 24,572 SF
Post-Bid
$8,200,000 est. value
Palmetto, FL 34221

Fire Station
New Construction - 6,150 SF
Results
Less than $890,000 est. value
Wausau, FL 32463

Fire Rescue Station 30 Construction
New Construction - 9,554 SF
Results
Less than $3,500,000 est. value
Lauderhill, FL 33313

Replace Fire Crash Rescue Station, 125th Fighter Wing, Jacksonville, FL
New Construction - 17,400 SF
Construction
$5,000,000 to $10,000,000 est. value
Jacksonville, FL 32218

Fire Station 10
Construction
Port Charlotte, FL 33948

Holt Fire Station
New Construction
Conception
$813,000 est. value
Holt, FL

SWFD Station Design
Design
Miramar Beach, FL 32550

Smith Creek Volunteer Fire Department Building
New Construction - 2,400 SF
Bidding
Sopchoppy, FL 32358

Last Updated 08/16/2021 08:36 AM
Project Title

Construction of Hernando Beach Fire Station No. 6

Physical Address View project details and contacts
City, State (County) Hernando Beach, FL 34607   (Hernando County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 to $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of complete demolition of existing pre-engineered metal building. Construct new 2-story crew quarters for a fire station. Ground floor area includes eight hundred and forty (840) square feet of enclosed area with breakaway construction due to coastal conditions, along with one thousand five hundred and thirty-six (1,536) square feet of exterior covered area. Second Floor at two thousand three hundred and seventy-six (2,376) square feet total, including bunk rooms, dayroom, kitchen, and offices. New Building to be constructed over existing building's footprint. Other Work indicated in the Contract Documents that includes Site Work as new entry drive with loop drive and aprons at the existing Apparatus Building. Covered breezeway between crew quarters and Apparatus Building, porch, and covered exit stairway from the second floor.

Details

Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents