Similar Projects
Design-Build Services for a Creek Bank Wall
Infrastructure
Bidding
Independence, MO 64058

Bristol Drainage Improvements
Infrastructure
Bidding
Independence, MO

Forest Park Waterway Project
Post-Bid
$7,102,880 est. value
Saint Louis, MO 63110

West Hangar Drainage Improvements
Post-Bid
Chesterfield, MO 63005

Elson Street Culvert Replacement
Results
Kirksville, MO

Corby Pond Restoration
Results
Saint Joseph, MO 64506

10th and Main Culvert Replacement
Infrastructure
Bidding
Joplin, MO

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
MO

Deer Creek Flood Mitigation Phase 2
Results
Brentwood, MO

Courthouse Drainage Improvements
Infrastructure
Bidding
Palmyra, MO

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
Bethany, MO 64424

Paddock Creek Improved Channel Repair
Results
$597,000 est. value
Chesterfield, MO

Harrison County Bridge 6870010-1 East Fork Big Creek
New Construction, Infrastructure
Bidding
Bethany, MO 64424

Clean and Shape Ditches
Alteration
Post-Bid
Martinsburg, MO

Metal Pipe (CMP and Arch Pipe)
Results
MO

Reported 07/07/2021 12:00 AM
Project Title

CMP Culvert Replacement

Physical Address View project details and contacts
City, State (County) MO   (Holt County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes Road 250 Installation of a 72” diameter x 112`long CMP Culvert including Rock Blanket and Road Aggregate

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents