Similar Projects
US 12/Walla Walla River Bridge - Bridge Painting
Infrastructure
Conception
$2,365,000 CJ est. value
Wapato, WA 98951

SR 410/1.0 miles E of Chinook Pass Summit - Culvert Lining
Infrastructure
Conception
$1,436,000 CJ est. value
Naches, WA 98937

Early Learning Center - Heritage University
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Toppenish, WA 98948

SR 22 / SR 223 Chambers Rd Intersection - Intersection Safety
Infrastructure
Design
$735,000 CJ est. value
Toppenish, WA 98948

SR 241/Mabton Vicinity - Retrofit Bridges
Infrastructure, Renovation
Bidding
$20,000,000 CJ est. value
Sunnyside, WA 98944

US 12 / Gordon Rd Bridge WB - Deck Rehabilitation
Infrastructure
Bidding
$10,000,000 CJ est. value
Yakima, WA 98908

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Construction of Drainage Improvement
Infrastructure
Post-Bid
$200,000 est. value
Sunnyside, WA

SVID Lining Projects
Infrastructure
Results
$60,000 est. value
Sunnyside, WA

Thorndyke Road MP 4.71 Culvert Replacement
Infrastructure
Results
$1,656,400 est. value

1st Level Reservoir Repair and Improvements
Infrastructure
Construction
$1,098,042 CJ est. value
Yakima, WA 98901

Surf Barreled
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Yakima, WA 98901

Childrens Village Expansion
Addition, Infrastructure, Renovation - 11,000 SF
Pending Verification
$6,400,000 CJ est. value
Yakima, WA 98902

I-82 / Columbia River Bridge WB - Deck Rehabilitation
Infrastructure, Renovation
Conception
$1,480,000 CJ est. value
Sunnyside, WA 98944

SR 241 / Allen Rd Intersection - Intersection Safety
Infrastructure
Design
$677,000 CJ est. value
Sunnyside, WA 98944

Last Updated 04/11/2023 01:04 AM
Project Title

SR 410/Rock Creek Vic - Chronic Environmental Deficiency

Physical Address View project details and contacts
City, State (County) Naches, WA 98937   (Yakima County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2025 , Construction documents
Bids Due View project details and contacts
Estimated Value $3,679,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SR 410 at Rock Creek currently experiences repeated flooding events and sediment build-up in the culvert under the highway, approximately 14 miles west of the US 12/SR 410 junction. This project will construct a larger area for sediment storage and overflow, and construct a new structure on SR 410 to minimize the risk of future flooding events. As of April 11, 2023, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be complete in the Fourth quarter of 2020. The contract advertisement is expected in first quarter of 2025 and construction is anticipated to be operationally complete in the four quarter of 2025. WSDOT - SR 410/Rock Creek Vic - Chronic Environmental Deficiency *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents