Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

2022 Surface Treatment
Infrastructure
Bidding
$4,361,000 est. value

2022 Plant Mix
Infrastructure
Bidding
$3,195,000 est. value

North King Street Corridor Improvements - Section 4
Post-Bid
Hampton, VA

Asphalt Repair Svcs
Term Contract, Infrastructure
Post-Bid
Hampton, Newport News, VA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Water Activated Cold Patch
Term Contract
Results

2022 Plant Mix
Infrastructure
Bidding
$2,152,000 est. value
VA

Roadway Repairs
Infrastructure
Post-Bid
Hampton, VA

Joint Assembly Replacement
Results
Less than $3,607,000 est. value
Hampton, VA

2022 Concrete Pavement Repairs
Infrastructure
Bidding
$3,503,000 est. value

2021 Plant Mix
Results
Less than $2,400,000 est. value

Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
Less than $95,000,000 est. value
Camp Lejeune, NC

Annual Needs Milling and Overlaying(Various Locations)
Term Contract
Results
Hampton, VA

I-64 Hampton Roads Express Lanes (HREL) Segment 4C Design-Build Project
Infrastructure
Results
Hampton, VA 23669

Last Updated 11/30/2021 01:42 PM
Project Title

I-64 Hampton Road Express Lanes (HREL) Segment 4C Design-Build

Physical Address View project details and contacts
City, State (County) Hampton, VA   (Hampton City County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located in the City of Hampton. The scope includes widening Eastbound (EB) and Westbound (WB) I-64 from 0.138 miles East of LaSalle Ave (MM265.5) to 0.500 miles East of Settlers Landing Rd (MM267.8). The three (3) existing EB and WB general purpose lanes will be converted into two (2) managed lanes, and two (2) general purpose (GP) lanes in each direction. This will extend the full roadway section of the HRBT Expansion project to the west for 2.4 miles. The western end of the project will connect to a typical section with one (1) managed lane and two (2) GP lanes. The proposed improvements include rehabilitation of the existing lanes and an additional 12’ wide travel lane in each direction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents