Similar Projects
Industrial Access Road Improvements
Infrastructure
Results
Ripley, WV

Silverton - Medina
Infrastructure
Results
WV

Structure Replacement PFC WF Harrison Memorial Bridge Replacement
New Construction
Results

Stonelick Creek Bridge
New Construction, Infrastructure
Results
WV

Marlinton-Huntersville Road
Infrastructure
Results
WV

Highway Pollinator Mitigation Site Development and Maintenance
Term Contract, Infrastructure
Results

Bridge Expansion Joint Repair System Emseal 6622C008
Renovation, Infrastructure
Results

Bridge Expansion Joint Repair System Silspec 6622C019
Renovation, Infrastructure
Results

Deep Injection Roadway Settlement Stabilization
Infrastructure
Results

2022 RPM
Infrastructure
Results

Multi-Well Federal Plugging Contract Region IV
Infrastructure
Post-Bid
$400,000 CJ est. value
Charleston, WV 25301

Fairplain - Ripley Rd
Infrastructure
Design
$18,750,000 CJ est. value
Ripley, WV 25271

Fairplain - Ripley Rd
Infrastructure
Design
$18,750,000 CJ est. value
Ripley, WV 25271

Ravenswood Industrial Park
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Ravenswood, WV 26164

Evans Church (Bragg) Portals
Infrastructure
Bidding
$500,000 CJ est. value
Evans, WV 25241

Last Updated 10/25/2022 08:36 AM
Project Title

Grasslick Creek Arch

Physical Address View project details and contacts
City, State (County) Ripley, WV 25271   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : STP0021428D Type of Work :Replace Bridge As of October 25, 2022, the project is in final planning status. The funding obligation date for the construction is August 28, 2022. WVDOT - Grasslick Creek Arch *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents