Similar Projects
Ballantyne Reimagined - Private Road Work
Design
Charlotte, NC 28277

Shade Valley Road Realignment and Roundabout
Infrastructure
Bidding
$3,426,038 est. value
Charlotte, NC 28205

2022 Resurfacing Project
Infrastructure
Bidding
Huntersville, NC

East Village Infrastructure
Post-Bid
$7,686,825 est. value
Charlotte, NC

Camp North End CIP Improvements
Post-Bid
Charlotte, NC

2019 Pavement Repair and Resurfacing Project
Results
Less than $392,000 est. value
Stallings, NC

Pavement and Structure Rehabilitation
Results

Construction of Bailey Road and Highway 115 Intersection Improvements
Post-Bid
Cornelius, NC 28031

Town Hall Resurfacing Project
Results
$562,482 est. value
Matthews, NC 28105

Asphalt Rejuvenating Application Services FY20
Post-Bid
Charlotte, NC 28202

Spring 2020 Streets Resurfacing Project
Results
Mint Hill, NC 28227

Blue Ridge Parkway
Post-Bid
$85,000,000 est. value

Tuckaseegee Berryhill Thrift Roundabout
Results
$2,000,000 to $2,500,000 est. value
Charlotte, NC 28206

Westinghouse Multi-Use Path
Post-Bid
$4,079,410 est. value
Charlotte, NC

2020 Paving Program
Results
Davidson, NC 28036

Last Updated 07/22/2021 08:38 AM
Project Title

Stowe Regional WRRF Southern Access Roads

Physical Address View project details and contacts
City, State (County) Charlotte, NC   (Mecklenburg County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is for the construction of an extension of the existing access road at the Long Creek Pump Station for operational connectivity between the proposed Stowe Regional WRRF and Long Creek Pump Station (Southern Access Road). The Southern Access Road consists of approximately 650 linear feet of paved roadway with 2-12 feet travel lanes and a three span approximately 235 feet long bridge that accommodates the two travel lanes and a pedestrian/utility corridor lane over Long Creek.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents