Similar Projects
Annual Price Agreement for Distribution Conductor
Bidding
College Station, TX 77842

TVMDL (Former) - DM 2021 MEP
Post-Bid
College Station, TX 77843

Electrical Maintenance and Repair Services for the TxDOT Bryan District
Term Contract
Post-Bid
Bryan, TX 77803

Solar Fabric Canopy for a "Hammock Grove"
Results
Less than $11,900 est. value
College Station, TX 77845

Provision and Installation of Kubota Generator
Results
Less than $15,400 est. value
College Station, TX 77845

5D4m-Replace Hospital Power Lines
Post-Bid
$25,000 to $100,000 est. value

138Kv Underground Transmission Line West Loop Riser Relocation Project
Results
Less than $1,677,680 est. value
Bryan, TX 77801

CSU Electric Underground Construction and Maintenance Contract
Term Contract
Post-Bid
$750,000 est. value
College Station, TX

Purchase of Electric Meter Pedestals
Results
College Station, TX 77842

Transformer Testing and Maintenance on Switching Blades
Post-Bid
Falcon Heights, TX

Purchase of Steel Poles for Steele Store to Smetana 138KV Line
Term Contract
Results
Less than $1,302,308 est. value
Bryan, TX 77803

Facility A/C Bacnet Repair
Post-Bid

Overhead Transmission Construction
Term Contract
Results
Less than $552,999 est. value
Bryan, TX 77805

Texas Avenue Phase 1B - Overhead to Underground Conversion
Post-Bid
Bryan, TX

First Phase Transformers
Term Contract
Results
Less than $358,770 est. value
Bryan, TX 956509

Last Updated 08/14/2020 02:27 PM
Project Title

Overhead/Underground Relocation for New Electrical Distribution Service Center

Physical Address View project details and contacts
City, State (County) Bryan, TX 77803   (Brazos County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to relocate four (4) distribution overhead feeders. Three (3) of the four (4) feeders will require underground dips with new concrete risers poles installed along Union Street while the fourth feeder (transmission under-build) will be converted to underground through the New Distribution Service Center area with the riser pole being installed on Northern Street. The 600 amp underground feeder will require pad-mounted switchgears with a pulling cabinet. A 200 amp three phase underground loop will be installed and feed out of the pad-mounted switchgears to service existing and new load. The relocation of the overhead feeders will require an outage on the Atkins 12.5KV distribution buss. Due to the summer load, the contractor will be required to complete work in two phases. Contractor will perform all work that can be done prior to the outage and complete pulling conductor into the 12.5kv buss once the outage can be obtained.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents