Similar Projects
Building One And Four Air Conditioning Installation GPC
Infrastructure, Alteration
Bidding
$1,247,800 est. value
Madison, WI 53704

Biosolids Drying, UV Disinfection and WPCF Upgrades
Infrastructure
Bidding
Beloit, WI 53511

Ionization System Installation
Post-Bid
Lancaster, WI 53813

HVAC Hot Water Heaters and Refrigerators Installment
Term Contract
Post-Bid

911 Center Data Room Backup Cooling
Results
Madison, WI 53703

Air-Cooled Chiller Replacement
Results
Juneau, WI 53039

Dryer No. 3 and Dryer No. 7 Exhaust Damper Replacements
Alteration
Bidding
Milwaukee, WI 53207

HVAC Upgrades for the Lake Mills High School Science Room and Math Room
Post-Bid
Lake Mills, WI 53551

Unit Heater Replacement
Results
Milwaukee, WI 53216

Ventilation Improvements MEP
Infrastructure
Bidding
Milwaukee, WI 53233

City Hall and Library, Recreation Center and Police Department Building HVAC Maintenance Services
Term Contract
Post-Bid
Waupaca, WI 54981

Heim Building AC Replacement
Results
Madison, WI 53713

Repair HVAC B103
Infrastructure
Bidding
$100,000 to $250,000 est. value
Fort McCoy, WI 54656

HVAC, Plumbing, and Steam Fitting Services
Term Contract
Post-Bid
Eau Claire, WI 54702

Municipal Services Building HVAC Improvements
Results
Appleton, WI 54911

Last Updated 03/02/2022 05:01 PM
Project Title

Cooling Tower Rebuild

Physical Address View project details and contacts
City, State (County) Lac du Flambeau, WI 54538   (Vilas County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Lake Superior Chippewa Indians will receive sealed proposals from qualified independent contractors to essentially rebuild an existing cooling tower at the Peter Christensen Health Center, including, but not limited to, removal, disposal and replacement of OEM fill material and cooling tower mechanical components.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents