Project Title | Elba Butcher Shoppe Parking Lot |
Physical Address | View project details and contacts |
City, State (County) | Bedford, VA 24523 (Bedford County) |
Category(s) | Heavy and Highway, Industrial/Manufacturing |
Sub-Category(s) | Manufacturing/Processing Plant, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $83,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Bedford County Economic Development Authority is seeking solicitations for paving services to the Elba Butcher Shoppe parking lot located at 212 East Washington Street, Bedford. All Inquiries For Information Should Be Directed To: Doug Coffman, Public Works Director, Phone: (540)586-7601x1392 , E-mail: dcoffman@bedfordcountyva.gov It is imperative that the Contractor has visited the job-site to review the existing conditions in order to accurately gauge the scope of work needed to revise the lay-out as shown on the drawing. The Contractor shall provide all equipment, resources and qualified personnel required to perform improvements as listed below: 2. A. General Requirements: 2.A.1 The contractor shall provide all labor and materials in order to prepare and pave the parking lot located at 212 East Washington Street, Bedford VA. 2.A.2 The contractor shall re-stripe all areas within the boundaries of work whether or not it is specifically shown on the drawings. New striping will be in the same location as existing striping if not indicated. 2.A.3 Mill concrete tie-ins to allow for smooth transitions. 2.A.4 Mill entire east side of building, apply levelling course throughout to mitigate and smooth final product, apply 2 of overlay throughout. 2.A.5 Remove asphalt and backfill with 6 topsoil in areas not indicated to have asphalt. 2.A.6 Remove concrete sidewalks as needed for new lay-out and prep, pour, and finish as needed for new lay-out indicated on the drawings. 2.A.7 Install CG-2 curb as indicated on the drawings. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |