Similar Projects
Bremerton Station
Renovation, Infrastructure
Conception
Bremerton, WA 98310

Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

SR 14, I-205 to SE 164th Avenue Auxiliary Lanes
Infrastructure
Bidding
$20,000,000 est. value
WA

I-5, Mounts Rd To Steilacoom-Dupont Rd - Corridor Improvements
Infrastructure
Bidding
$165,000,000 to $195,000,000 est. value
WA

Hatch Road Bridge Deck Replacement
Infrastructure
Post-Bid
$1,800,000 to $2,200,000 est. value
Spokane, WA

Sylvester Street Safety Improvements
Infrastructure
Post-Bid
Pasco, WA 99301

124th Avenue NE- NE 12th Street to NE Spring Boulevard
Infrastructure
Results
$8,221,853 est. value
Bellevue, WA 98007

I-5, SR 506 to Toledo Vader Road Vicinity NB Paving
Infrastructure
Results
Toledo, WA 98591

Highway 99 Gateway and Revitalization Project
Infrastructure, Alteration
Bidding
Edmonds, WA 98020

150Th Ave Se / Se 38Th St To Eastgate Way - Roadway Improvements
Infrastructure
Post-Bid
Bellevue, WA

SR 167,I-5 to SR 509 - New Expressway
Infrastructure
Results
$325,000,000 to $375,000,000 est. value
WA

Road 100 and Maple Drive Extension
Infrastructure
Bidding
$950,000 est. value
Pasco, WA

West Ahtanum Road Resurfacing
Infrastructure
Post-Bid
Union Gap, WA 98903

Sequim-Dungeness Way and Woodcock Road
Infrastructure
Results
$900,000 to $1,000,000 est. value
Sequim, WA 98382

Chief Joseph Wildlife Area Road Stabilization Phase 2
Infrastructure
Bidding
Olympia, WA

Reported 04/20/2022 12:00 AM
Project Title

Accelerated Streets Resurfacing 2022

Physical Address View project details and contacts
City, State (County) Pullman, WA   (Whitman County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $368,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of approximately 3 - 100 tons of hot mix asphalt pavement - 5 - 750 square yards of pavement grinding - 3 - 800 cubic yards of road excavation and haul - and placing 6 - 800 tons of crushed surfacing. Other project work includes reconstructing existing curb ramps according to ADA guidelines - installing two traffic circles - and miscellaneous signage - utility - and sidewalk work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents