Similar Projects
Wayfinding System
Infrastructure
Conception
$200,000 CJ est. value
Troy, NY 12180

Cottage Street Garages
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Troy, NY 12180

Troy Winter Garden at Quackenbush Square
Addition, Demolition, New Construction, Infrastructure, Renovation - 80,000 SF
Design
$40,000,000 CJ est. value
Troy, NY 12180

Forrest Ridge Residential Development
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Wynantskill, NY 12198

Roadway Striping
Infrastructure
Bidding
$440,000 CJ est. value
Troy, NY 12180

Water Main Replacement
Infrastructure
Bidding
$300,000 CJ est. value
North Greenbush, NY 12144

One Monument Square
New Construction, Infrastructure - 179,000 SF
Post-Bid
$64,000,000 CJ est. value
Troy, NY 12180

Tempel Lane Extension and Third Avenue Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
East Greenbush, NY 12061

Bridge Preservation Painting, i-90 and i-890 Corridors
New Construction, Infrastructure
Results
$530,000 est. value

Stop 13 Road Bridge Over Wynants Kill Creek
Renovation, Infrastructure
Results
West Sand Lake, NY 12196

2nd Dyke Road Culvert
Infrastructure
Construction
$700,000 CJ est. value
Sand Lake, NY 12153

Fifth Avenue / Day Care Center
Addition, Demolition, Infrastructure - 18,000 SF
Construction
$4,600,000 CJ est. value
Troy, NY 12180

River Street Senior Housing
New Construction, Infrastructure
Pending Verification
$46,400,000 CJ est. value
Troy, NY 12180

Valley Avenue Apartments and Restaurant
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Troy, NY 12180

RFQ Engineering - Professional Engineering Services - Civil and Transportation Consultant
Infrastructure
Conception
$500,000 CJ est. value
Troy, NY 12180

Last Updated 06/27/2023 01:18 PM
Project Title

Water Plant Bridge

Physical Address View project details and contacts
City, State (County) Castleton on Hudson, NY 12033   (Rensselaer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,082,280 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of June, 2023, construction is underway and expected to be completed by the end of 2023. The request must provide the following information: complete firm name,contact person, phone number, and email address. Documents will be emailed to the address provided. There is no charge for electronic files delivered by email. Only bidders who requested and received the contract documents directly from Laberge Group shall be permitted to bid. Any bidder that is not on the Laberge Group plan holder list will have their bid returned unopened.All qualified bidders, upon return of full Contract Documents, will be refunded the full deposit. All nonbidders, upon return of full Contract Documents, will be refunded one-half of the deposit. All documents, returned for refund, must be received complete, in good condition and within thirty (30) days of the Bid Opening.The Owner reserves the right to waive any informalities or to reject any or all bids.Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders.Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the Contract. Bidders of this work will be required to comply with the presidents executive orders #11246 and #11375. The requirements for bidders andcontractors under this order, which concerns non-discrimination inemployment, are explained in the specifications. Minority and Womens Business Enterprises as well as Section 3 Business Enterprises are stronglyencouraged to apply.No bidder may withdraw his bid within forty-five (45) days after the actual date of the opening thereof. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Expansion Control.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Bridges.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents