Similar Projects
Request for Contractor Prequalifications
Renovation, Infrastructure
Bidding
Thornton, CO

Phase I Recycled Water Pipeline - Segment 2
Infrastructure
Bidding
$200,000 est. value
Bennett, CO 80102

Repair of 12 Inch Waterline - Piney creek Crossing at Saddle Rock Golf Course
Post-Bid
$380,000 est. value
Aurora, CO 80016

2022 Water System Improvement
Post-Bid
Aurora, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Reunion Center Stead School Phase District: Reunion Center Metropolitan District No 1
Results
Commerce City, CO 80022

2022 PRV Vault Improvement
Post-Bid
Aurora, CO

On Call Construction Services II for Priority Repairs of Water, Wastewater and Stormwater Infrastructure
Results
Aurora, CO

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Steel Pipeline Program (Prime Contractors)
Results
Aurora, CO

Aurora Water Manhole Products (Cast Iron Covers, Rings, Frames and Grates)
Infrastructure
Post-Bid
Aurora, CO

Steel Pipeline Program (Tunneling Subcontractors)
Results
Aurora, CO

Thornton Water Project - Utility Locating Services
Infrastructure
Post-Bid
Thornton, CO

Cross Connection Devices
Results
Denver, CO

Thornton Water Project - Pipe Purchase
Infrastructure
Post-Bid
Thornton, CO

Reported 06/30/2022 12:00 AM
Project Title

Northern System Surge Anticipator Valve Replacement

Physical Address View project details and contacts
City, State (County) Aurora, CO 80019   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes removal and replacement of two existing 18" surge anticipator valves at the NBPS and removal and replacement of two existing 20" surge anticipator valves at the SBPS, along with valve control panels and instrumentation integration with existing ECCV SCADA systems.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents