Similar Projects
Microsurfacing- MAH/TRU MCRO FY2022
Bidding

Devitt Avenue Resurfacing
Bidding
Campbell, OH 44405

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Akron, Athens, Avon, Bellefontaine, Cincinnati, Columbus, Defiance, Huber Heights, Kent, Marietta, Mason, Saint Clairsville, Sidney, Wadsworth, Wheelersburg, Xenia, Youngstown, OH

Spot Safety - D04 PSIP Phase 2
Post-Bid
Akron, Canton, Youngstown, OH

West Wood Street Improvements Project
Results
$240,000 est. value
Lowellville, OH 44436

Bandy Road “Trailstar” Road Improvements
Results
Less than $176,724 est. value
Youngstown, OH 44500

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Bidding

MAH - Youngstown SRTS 2018
Post-Bid
Youngstown, OH 44504

Crack Sealing - CS FY2020
Results

Stoltz Road Improvements - Phases 2 and 3
Bidding
$1 to $163,800 est. value
Lake Milton, OH

2021 Crack Sealing of Various Roads in Boardman Township
Post-Bid
Boardman, OH

MAH CR 117 Meridian Road Phase 2
Results
Less than $3,062,537 est. value
Youngstown, OH 44503

Asphalt Replacement and Repair
Bidding
Youngstown, OH

Resurfacing of Various Roads in Boardman Township
Post-Bid
Boardman, OH

Two Lane Resurfacing - US 62/Var-09.67/Var
Results
OH

Last Updated 04/05/2021 10:11 AM
Project Title

Austintown Township Resurfacing and Improvements Project

Physical Address View project details and contacts
City, State (County) Austintown, Youngstown, OH 44515   (Mahoning County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes pavement planning and asphalt pavement resurfacing of four streets within Austintown Township including sections of N. Edgehill, Carnegie, Westgate, and Pembrook. The total length of the project is 0.44 miles. Additionally, 239 square feet of existing sidewalk will be removed and 79 square feet of 4 sidewalk will be constructed. ADA curb ramps will be installed at the N. Edgehill/Oakwood and Carnegie/Oakwood intersections. Incidental work such as adjusting manholes to grade is anticipated.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents