Similar Projects
Plant 4 - Elevated Water Tank
New Construction, Infrastructure
Bidding
$2,200,000 CJ est. value
Purvis, MS 39475

Magee Industrial Site: Contract B - Elevated Water Tank
Infrastructure
Post-Bid
Pontotoc, MS

NTS Water Association
Infrastructure
Post-Bid
Meridian, MS

2019 Water System Improvements Contract II - Storage Improvements
Infrastructure
Results
MS

2019 Water System Imrovements Contract V - Rehabilitation of Existing Elevated Tank (4)
Infrastructure
Results
Jackson, MS 39204

NTS Water Association
Infrastructure
Post-Bid
Meridian, MS 39304

Elevated Storage Tank
Infrastructure
Results
$3,533,000 est. value
Diamondhead, MS

2020 Water System Improvements Project
New Construction, Infrastructure
Post-Bid
$623,705 CJ est. value
Sallis, MS 39160

Surge Vessel at Anderson Lift Station
Infrastructure
Results
Oxford, MS

2020 Water System Improvements
Infrastructure
Post-Bid
$623,705 CJ est. value
Sallis, MS 39160

Water System Improvements - 2022 CDBG Project
Infrastructure
Results
Gloster, MS

Improvements to Five (5) Water Tanks
Infrastructure
Post-Bid
$300,000 CJ est. value
Philadelphia, MS 39350

Rankin - 150,000 Gallon Elevated Water Tank
Infrastructure
Results
Brandon, MS

Elevated Water Storage Tank Improvements
Infrastructure
Results
Sherman, MS

Lake Caroline Elevated Water Storage Tank
Renovation
Results
$1,780,273 CJ est. value
Canton, MS 39046

Last Updated 02/17/2023 11:38 AM
Project Title

Rehabilitation and Repainting of a 150,000- Gallon Elevated Water Tank

Physical Address View project details and contacts
City, State (County) Florence, MS 39073   (Rankin County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $205,216 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of the rehabilitation and repainting of a 150,000- gallon elevated water tank For questions related to the online bidding process,available online Bid security in the form of a Bid Bond, certified check or cashier's check in an amount equal to five percent (5%) of the Bid shall be furnished by each Bidder as required by the Contract Documents Minority and woman's business enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities, equipment, material and/or supply needs. Central Rankin Water Association, Inc. reserves the right to reject any and all Bids and to waive any and all informalities and reserves the right to hold all Bids for examination for a period not to exceed sixty (60) days and to award the Contract to the lowest and best Bid complying with the Plans and Specifications within said time.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents