Similar Projects
Brandon Middle School Renovations
Renovation
Conception
Ortonville, MI 48462

Loy Norrix High School - 2022 Bond - Kalamazoo Public Schools
Renovation
Conception
$5,000,000 est. value
Portage, MI 49002

Air Conditioning and Quality Improvements Package 4 - 2022 Bond - Lansing School
Renovation
Design
$4,100,000 est. value
Lansing, MI

Building Replacement 4 - 2022 Bond - Lansing School District
Renovation
Design
$30,800,000 est. value
Lansing, MI 48933

Rozsa Center Lobby Flooring and Painting
Alteration
Bidding
Houghton, MI

Saint Louis Link Learning Center
Renovation - 5,625 SF
Bidding
$1,500,000 CJ est. value
Saint Louis, MI 48880

2023 ESSER Work Pre-purchase HVAC - Pre-Purchase Package Dudley STEM, Fremont and LaMora Park Elementary Schools
Term Contract
Sub-Bidding
Battle Creek, MI 49017

2020 Bond Bid Package No. 5A
Post-Bid
Novi, MI 48374

Cheboygan Housing Main Space Laminate Wood Flooring Install
Post-Bid
Cheboygan, MI 49721

Centreville Elementary and Jr/Sr Building Improvements - Bid 2
Renovation
Results
Centreville, MI 49032

Renovations to Various Schools-BP 2
Renovation
Results
Farmington, MI

Brother Rice High School - Locker Room & Academics Renovations - Phase 1B
Renovation - 19,550 SF
Construction
Bloomfield Hills, MI 48301

The Salvation Army: Camp Echo Grove: New Mervyn Price Chapel & Performing Arts Center
New Construction - 26,440 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Leonard, MI 48367

REVERB - Hard Rock Hotel
New Construction
Pending Verification
$44,000,000 est. value
Kalamazoo, MI 49007

Burgtorf Building - 2022 Bond - Kearsley Community Schools
Renovation
Design
$2,000,000 est. value
Flint, MI 48506

Last Updated 07/28/2022 10:10 AM
Project Title

2020 Bond Series 2 Phase 2 Western High School Auditorium Renovations

Physical Address View project details and contacts
City, State (County) Auburn, MI 48611   (Bay County)
Category(s) Education, Entertainment/Recreation, Single Trades
Sub-Category(s) Flooring, Middle/Senior High School, Theaters/Auditoriums
Contracting Method Competitive Bids
Project Status Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $506,652 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Project was awarded as follows: Wobig Construction Co - General Trades Notheastern Paint Supply Inc - Flooring Murray Painting - Painting Irwin Seating Company - Auditorium Seating 2020 Bond Series 2 Phase 2 Western High School Auditorium Renovations The Project will utilize separate prime contractors. All contracts for construction will be direct contracts with the Owner. Overall administration of the Project will be the responsibility of the Construction Management Firm, Wolgast Corporation. The Owner will award contracts on or about May 9, 2022, to separate prime contractors for separate bid divisions or combinations of bid divisions. All bids shall be submitted on the bid forms provided in the project specifications, completely filled in, and executed (copies of the bid forms are acceptable). Facsimile bids will not be accepted. All questions regarding the bidding procedures, design, and drawing/specification intent are to be directed to the Construction Manager on a Clarification Request Form (Section 00310), attention Dale Schwerin. A Bid Security by a qualified surety authorized to do business in the state where the Project is located and in the amount of five percent (5%) of the Base Bid shall accompany each proposal or proposal combination. The Bid Security may be in the form of a Bid Bond, Cashier's Check, or Money Order. Personal checks are NOT acceptable. Bids may not be withdrawn for a period of sixty (60) days after the bid date. Successful Bidders may be required to furnish Surety Bonds as stated in the Project Specifications (Section 00600). The Owner reserves the right to reject any or all proposals, accept a bid other than the low bid, and to waive informalities, irregularities, and/or errors in the bid proposals, which they feel to be in their own best interest. Bid Result- General Trades Wobig 217,771 Flooring Northeastern Painting 43,584 Painting Murray Paint 75,422 Seating Irwin Seating 169,875

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Projection Screens, Projectors, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating, Fixed Audience Seating.
Division 13 - Special Construction, Sound, Vibration, and Seismic Control.
Division 21 - Fire Suppression, Fire Suppression Systems Insulation, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Theatrical Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents