Similar Projects
Manchester Expressway Mixed-Use Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Columbus, GA 31904

Touching Lives Globally Foundation Assisted Living Community
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Columbus, GA 31901

Repair Barracks Building 17, Fort Benning
Term Contract, Renovation, Infrastructure
Design
$100,000,000 CJ est. value
Fort Benning, GA 31905

Infantry Road and Follow Me Trail Extension
Infrastructure
Design
$1,000,000 CJ est. value
Columbus, GA 31903

Multiple New Construction Residential Properties
New Construction, Infrastructure
Bidding
$350,000 CJ est. value
Columbus, GA 31907

Taxiway F Pavement Rehabilitation
Infrastructure
Bidding
$1,920,000 CJ est. value
Columbus, GA 31909

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Academic Building and 56 Bed Housing Units - Department of Juvenile Justice
New Construction, Infrastructure - 47,000 SF
Post-Bid
$26,900,000 CJ est. value
Columbus, GA 31820

Water Main Cleaning and Lining Fiscal Year 2022-2026
Infrastructure
Results
Columbus, GA

Distribution System Small Line Replacement Program - Package 1
Infrastructure
Results
$750,000 to $1,500,000 est. value
Columbus, GA

Overburden Storage
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Columbus, GA 31808

Marriott Expansion / Columbus
Addition, New Construction, Renovation, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Columbus, GA 31901

$PRESS - Battalion Operations Facility - Sauer Construction LLC
New Construction, Infrastructure
Design
$63,900,000 CJ est. value
Fort Benning, GA 31905

Pipe Lining System With Trailer, Mix, Pump and Spray System
Infrastructure
Post-Bid
Columbus, GA

Widening and Reconstruction on Cusseta Rd (CR 62)
Infrastructure
Results
$39,683,951 CJ est. value
Columbus, GA 31903

Last Updated 05/10/2023 08:01 PM
Project Title

Uptown and South Commons CSO Disinfection and Dechlorination and Uptown CSO Grit Improvements

Physical Address View project details and contacts
City, State (County) Columbus, GA 31901   (Muscogee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

1. Construction of a new disinfection building with unloading station and a new chemical feed vault on an existing 72-inch combined sewer line at the 29th Street site; 2. Upgrades to the dechlorination system at the Uptown CSO Facility, and conversion of the existing advanced treatment building to a chlorine contact chamber; 3. Upgrades to the disinfection system at the South Commons CSO Facility. 4. Installation of a new dechlorination system at the South Commons CSO Facility, conversion of an existing sampling station to a new dechlorination feed station, construction of a new sampling station with fiberglass building, and site improvements including a new access driveway from the existing driveway to the new sampling station. 5. Re-piping the grit discharge lines from six existing grit vortex units, rerouting piping, replacing vortex unit influent pinch valve sleeves, replacing existing pumps and installing new pumps at the Uptown CSO facility. The successful Bidder for this Contract will be required to furnish a satisfactory Performance Bond and Payment Bond each in the amount of 100 percent of the Bid. The Owner reserves the right to reject all Bids, to waive informalities and to readvertise. Furnishing all products, materials and equipment and performing all labor necessary to complete and put into operation the Uptown and South Commons CSO Disinfection and Dechlorination (Project No. 35774-71) SCADA and Instrumentation, Building Security Systems, Construction Verification Surveying, Removal of Unsuitable Material and Replacement with, Crushed Stone. MBE (10%), WBE (5%) Uptown and South Commons Disinfection and Dechlorination project - substantially completed within 400 consecutive calendar days; final completion- 460 consecutive calendardays Uptown CSO Grit Improvements project - substantially completed within _550___ consecutive calendar days; final completion- 610___ consecutive calendar days. 1. Construction of a new disinfection building with unloading station and a new chemical feed vault on an existing 72-inch combined sewer line at the 29th Street site; 2. Upgrades to the dechlorination system at the Uptown Park CSO Facility with a new storage tank and chemical feed pumps, and conversion of the existing advanced treatment building to a chlorine contact chamber; 3. Upgrades to the disinfection system at the South Commons CSO Facility including replacement of two bulk storage tanks and new chemical feed pumps; 4. Installation of a new dechlorination system at the South Commons CSO Facility with two new bulk storage tanks and new chemical feed pumps, conversion of an existing sampling station to a new dechlorination feed station, construction of a new sampling station with fiberglass building, and site improvements including a new access driveway from the existing driveway to the new sampling station. 5. Re-piping the grit discharge lines from six existing grit vortex units, reroutingpiping, replacing vortex unit influent pinch valve sleeves, replacing existing pumps and installing new pumps at the Uptown CSO facility. Question Deadline 05/25/2023 Information / Clarification shall be submitted in writing by Email.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents