Similar Projects
Razing and Removing Buildings
Infrastructure
Bidding

AHU 11 and 12 Steam Coil Replacement
Alteration
Bidding
$221,200 est. value
Green Bay, WI 54311

Sources Sought Notice for Bureau of Indian Affairs (BIA) Demolition Indefinite
Demolition
Post-Bid
$25,000 to $200,000,000 est. value

Pioneer, Valley View, and High School Air Conditioning
Post-Bid
Green Bay, WI 54313

Northeast Wisconsin Technical College Fan Wall Upgrade
Results
Green Bay, WI 54303

LED Upgrade at the Northern Building
Results
$25,000 est. value
Green Bay, WI 54301

Lighting Upgrades
Alteration
Bidding
Green Bay, WI 54301

HVAC and Mechanical Products
Term Contract
Post-Bid

Fire Response Ranger Station Replacement -MEP
New Construction
Results
Less than $1,800,000 est. value
Anston, WI

Salvage of Materials
Post-Bid
Green Bay, WI 54311

Razing And Removing Buildings
Infrastructure
Results

Electrical Services
Term Contract
Post-Bid
Green Bay, WI

Station No. 1 Air Conditioning
Alteration
Results
Green Bay, WI 54301

KICC Lighting and AV Upgrades
Post-Bid
Green Bay, WI 54301

Green Bay Facility Pumping Station HVAC Rehabilitation
Post-Bid
Green Bay, WI

Reported 09/15/2021 12:00 AM
Project Title

Isolation Rooms

Physical Address View project details and contacts
City, State (County) Oneida, WI   (Brown County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Demolition, Electric, Fire Protection, HVAC, Plumbing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves modifying the existing HVAC system and associated finishes/systems in two buildings to create isolation (negative pressure) rooms. Work consists of interior demolition, concrete cutting, interior finishes, fire protection, HVAC, and Electrical. Plumbing will be by Owner.

Details

Division 02 - Existing Conditions, Demolition.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents