Similar Projects
Fire Station 70
New Construction
Conception
$1,580,000 est. value
Phoenix, AZ 85029

Fire Station No. 8
New Construction - 14,150 SF
Conception
$14,251,320 est. value
Peoria, AZ

New Van Buren Street Fire Station
New Construction - 19,000 SF
Design
$9,425,000 est. value
Avondale, AZ 85392

Fire Station 171 Relocation/Reconstruction
Renovation
Design
$1,320,000 est. value
Avondale, AZ 85323

Police Detention Center and Fire Station CMAR
New Construction
Bidding
Avondale, AZ

Police Dispatch Center Expansion (CMAR)
Renovation - 10,600 SF
Post-Bid
Gilbert, AZ

Police Dispatch Center Expansion (PM/CM)
Renovation - 10,600 SF
Post-Bid
Gilbert, AZ

CMAR - Fire Station No. 2
Results
$58,712 est. value
Queen Creek, AZ 85142

Construction Manager at Risk (CMAR) Fire Station No. 5
Results
$56,490 est. value
Queen Creek, AZ 85142

Northeast Fire Station 222
New Construction
Pending Verification
Mesa, AZ

Southeast Fire Station 221
New Construction
Pending Verification
Mesa, AZ

Chandler Heights Substation Wellness Center
Renovation
Conception
$495,000 est. value
Chandler, AZ

Police Training Center
New Construction
Design
$5,964,994 est. value
Buckeye, AZ

Construction Manager at Risk (CMAR) Services for Fire Station 282 Reconstruction
Renovation
Post-Bid
Chandler, AZ

Construction Manager at Risk for Project 26 Replace Deteriorating Vehicle Training Track
New Construction, Renovation
Results
$19,000,000 est. value
Tempe, AZ 85281

Last Updated 09/15/2021 06:00 PM
Project Title

Goodyear Police Department Building Phase II - Preconstruction and Construction

Physical Address View project details and contacts
City, State (County) Goodyear, AZ 85338   (Maricopa County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method
Project Status Construction Commenced 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $12,000,000 to $14,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Goodyear, is soliciting proposals from qualified general contractors to perform as a Construction Manager at Risk and provide Preconstruction Design Phase and Construction services for the Goodyear Police Department Operations Building Phase II. The project is an approximately 23,000 up to 27,000 gross square foot addition to the existing Goodyear Police Operations Building located at 14455 W Van Buren Street, Suite E101, Goodyear, AZ 85338 including, structure, tenant improvements to the existing facility, and site development to make the new addition fit seamlessly with the existing features.

Details

Fire/Police Station, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Acoustic Treatment, Painting and Coating, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents