Similar Projects
A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Bidding
Less than $45,000,000 est. value
Washington, DC

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Bidding
Less than $45,000,000 est. value
Washington, DC

Water Tank Inspections, OCONUS and CONUS
Post-Bid
$10,000 to $5,000,000 est. value

Water Tank Inspections, OCONUS and CONUS
Post-Bid
$10,000 to $5,000,000 est. value

USDA Forest Service Eastern Region Architect & Engineer Services IDIQ
Results
$2,500 to $5,000,000 est. value

USDA Forest Service Eastern Region Architect & Engineer Services IDIQ
Results
$2,500 to $5,000,000 est. value

Indefinite Delivery Indefinite Quantity Architectural-Engineering Contracts
Design

Architect and Engineering Services for Production Technical Services (PTS) for FEMA's Risk MAP Program
Bidding
$10,000 to $300,000,000 est. value

NGB Fire Protection – National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Post-Bid
$70,000 to $10,000,000 est. value
Washington, DC

Florida Windspeed UFC Update
Results

Indefinite Delivery/Indefinite Quantity (IDIQ), Multi-Discipline Architect-Engineer (A-E) Services for Facilities Primarily Located In Maine, New Hampshire, Connecticut, Rhode Island, New York, New Jersey
Bidding
$2,000,000 to $10,000,000 est. value

National Guard Bureau, Region 6, Architect and Engineering Indefinite Delivery Indefinite Quantity Contract for Vertical Projects
Post-Bid
$110,000 to $35,000,000 est. value

Various Phase III Construction Inspection Projects
Results
$100,000 to $25,000,000 est. value

Last Updated 08/27/2020 08:24 AM
Project Title

A/E Services Renovate Rend Lake Resort Facilities

Physical Address View project details and contacts
City, State (County) Whittington, IL 62897   (Franklin County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $6,000,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Wayne Fitzgerrell State Park, 84-building facility. Renovation and modernization of existing Rend Lake Resort facilities. Typical renovations will include new roofing, flooring, interior wall and ceiling surfaces, exterior surfaces, windows, doors, bathroom and kitchen fixtures, appliances, HVAC systems including dehumidification, banquet facilities and furniture. During this phase of the renovation, work will focus on the duplex cabins, the Schooner and Flagship Boatels, the banquet facilities within the conference center, the restaurant and gift shop. The A/E will need to perform mechanical tests on all HVAC systems, fire alarm systems, security systems and fire suppression systems to ensure that they comply with current code requirments. Microbial testing and possible environmental remediation will also be required to verify that the structures are free of microbial contamination. The two remaining boatels will also require a structural assessment to identify any potential structural deficiencies. All renovation work will need to comply with the 2018 Illinois Accessibility Code. The A/E will need to determine if any components of this project are eligible for a utility company or other energy grant/rebate and will be responsible for preparing and submitting the grant application if the project qualifies for the rebate. The interviews for this project are tentatively scheduled for September 30, 2020.

Details

Division 00 - Procurement and Contracting Requirements, Available Project Information, Environmental Assessment Information.
Division 01 - General Requirements, Quality Control, Testing and Inspecting Services, Commissioning, Facility Shell Commissioning, Roofing Commissioning.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents