Similar Projects
Lincoln Ave Rehabilitation - California To Silverado - City Of Napa
Alteration
Conception
$2,500,000 est. value
Napa, CA 94559

Hennessey Treatment Plant Paving Improvements - WQ23UT07 - City of Napa
Infrastructure
Conception
$250,000 est. value
Napa, CA 94558

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

MT 3023 Measure T Street Rehabilitation at Various Locations
Infrastructure
Bidding
$285,000 est. value
Yountville, CA

Imola Ave and SR-29 Express Bus Improvements Project
Infrastructure
Post-Bid
$2,600,000 est. value
Napa, CA 94559

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Silverado Trail Phase L Paving
Infrastructure
Results
$1,400,000 est. value
Napa, CA 94558

Cold Plane AC, Place HMA (TYPE A) and RHMA-G
Infrastructure
Results
$8,600,000 est. value
CA

Park Ave and El Centro Highway Crossings Construction - WD25UT03 - City of Napa
Infrastructure
Conception
$1,000,000 est. value
Napa, CA

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

HMA, Roadway Excavation, Structural Conc and Modifying Lighting Systems
Infrastructure
Results
$42,000,000 est. value
CA

Imola Avenue Rehabilitation - Soscol to East End - ST22PW07 - City of Napa
Infrastructure
Conception
Less than $2,500,000 est. value
Napa, CA 94558

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Napa Valley Vine Trail - Street Helena to Calistoga
Infrastructure
Results
$9,500,000 est. value
Calistoga, Saint Helena, CA 94574

Berry Street Pavement Rehabilitation
Infrastructure
Post-Bid
$300,000 est. value
Calistoga, CA 94515

Reported 06/22/2022 03:18 PM
Project Title

Salvador Avenue Complete Streets - City of Napa

Physical Address View project details and contacts
City, State (County) Napa, CA 94558   (Napa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

******The contact(s) will not accept phone call inquiries at this time.****** Description: Completes streets infrastructure improvements including roadway widening to accommodate bicycle and pedestrian facilities As of June 21, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents