Similar Projects
Middlesboro Channel Clearing
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Middlesboro, KY 40965

MFWQTC Primary Sedimentation Basin Rehabilitation
Alteration
Bidding
$32,000,000 to $36,000,000 est. value
Louisville, KY 40211

Flood Repair for Fema
Infrastructure
Bidding
KY

Shoreline Erosion Control Green River Lock and Dam #1
Post-Bid
$25,000 to $100,000 est. value
Reed, KY

Buffalo Lake Restoration
Post-Bid
Elizabethtown, KY

Proposals Recommending Culvert Repair or Replacement Solutions for Culverts at Aj Jolly Park
Results
Less than $98,000 est. value
Newport, KY

Grandview Stabilization
Results
Newport, KY

Flood Repair for Fema
Infrastructure
Bidding
KY

Middlesboro, KY Channel Clearing
Post-Bid
$1,000,000 to $5,000,000 est. value
Middlesborough, KY

Rust Drive Bridge Erosion Remediation
Results
Less than $22,500 est. value
Taylor Mill, KY

Flood Repair for Fema
Infrastructure
Bidding
KY

8018 South Third Street Road - Drainage Improvement and Building Underpinning
Post-Bid
Louisville, KY 40214

Concrete Retaining Wall
Results
Burlington, KY

Flood Repair for Fema
Infrastructure
Bidding
KY

PreQualifications for Crescent Hill Discharge System Improvements
Post-Bid
Louisville, KY

Last Updated 07/22/2021 06:10 PM
Project Title

Flood Protection Flap Gate Replacement

Physical Address View project details and contacts
City, State (County) Paducah, KY   (McCracken County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project will consist of replacement of flap gates and sluice gates.

Details

Division 02 - Existing Conditions, Demolition.
Division 31 - Earthwork, Site Clearing, Excavation and Fill, Dewatering, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 40 - Process Integration, Common Work Results for Process Integration, Common Work Results for Process Piping, Ductile, Malleable, and Cast Iron Alloys Process Piping.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents