Last Updated | 07/21/2022 11:31 PM |
Project Title | Nutrient Reduction Wetland Project |
Physical Address | View project details and contacts |
City, State (County) | Adel, IA 50003 (Dallas County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $237,002 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bids must be submitted on the appropriate bid forms provided and shall include a bid bond in the amount of ten percent (10%). Bidders must also be registered with the Iowa Division of Labor. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheet pile weir construction, tile installation, CMP water control structure, and seeding. This project includes around 11,900 cubic yards of earthwork, 1,940 square feet of steel sheet pile, 380 linear feet of tile installation, 402 tons of rock riprap, 54 cubic yards of grout, and 4.6 acres of seeding. The estimated construction cost range for this project is $200,000 to $250,000. The Plans and Construction Specifications governing the construction of the proposed improvements have been prepared by Caleb Rasmussen, P.E., JEO Consulting Group, Inc., and are hereby made a part of this notice by reference and the proposed contract shall be executed in compliance therewith The successful bidder shall be required to furnish a Performance/Payment Bond in an amount equal to one hundred percent (100%) of the contract price. Questions concerning the Plans and Construction Specifications should be in writing and addressed to Caleb Rasmussen, (crasmussen@jeo.com), and must copy Casey Judge, Division (casey.judge@iowaagriculture.gov). All other questions concerning other Contract Documents should be addressed to Casey Judge, Division, casey.judge@iowaagriculture.gov or (515) 725-4119. To be considered in a final addendum, written questions must be received by 4:00 PM on June 22, 2022. The Division reserves the right to reject any or all proposals and to waive technicalities and irregularities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. WORK OR PROJECT Work to be completed and equipment, supplies, and materials to be furnished under the Contract, General Conditions, Special Conditions, Construction Specifications, Drawings, Addenda, and Modifications to these Contract Documents issued subsequent to their initial printing, unless some other meaning is indicated by the context. The Project is the DAL792708B Nutrient Reduction Wetland in Section 08, Township 79 North, Range 27 West, in Dallas County, Iowa. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheet pile weir construction, tile installation, CMP water control structure, and seeding. This project includes around 11,900 cubic yards of earthwork, 1,940 square feet of steel sheet pile, 380 linear feet of tile installation, 402 tons of rock riprap, 54 cubic yards of grout, and 4.6 acres of seeding. The estimated construction cost range for this project is $200,000 to $250,000 |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |