Similar Projects
Last Updated | 08/06/2023 02:09 AM |
Project Title | 2023 Insurance Claim - Re-roof Project |
Physical Address | View project details and contacts |
City, State (County) | Prague, OK 74864 (Lincoln County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $150,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The PRAGUE HOUSING AUTHORITY will receive sealed proposals until the date and time stated above for the 2023 INSURANCE CLAIM - RE-ROOF PROJECT consisting of exterior repair or replacement of roofing, siding, gutters and downspouts and other miscellaneous items including all necessary labor, materials, equipment and supervision to accomplish the described work at all specified buildings as detailed and defined in the Bid Documents at the Housing Authority located in Prague, Oklahoma. Copies of the bid packet may be obtained from the Architect's office by qualified bidders. An electronic PDF version of bidding documents may be obtained from the Architect. Bid Security in the form of a certified check or bank draft payable to the PRAGUE HOUSING AUTHORITY, U.S. Government bonds or a satisfactory bid bond executed by the bidder and acceptable sureties in an amount equal to five percent (5%) of the bid shall be submitted with each bid. Security checks will be returned to all but the three lowest bidders immediately after the bid opening. The three lowest bid securities are retained until the contract is awarded. Each bidder shall complete the NONCOLLUSIVE AFFIDAVIT, Certification of Bidder regarding EQUAL EMPLOYMENT OPPORTUNITY, Certification of Bidder regarding NONSEGREGATED FACILITIES, Statement of BIDDERS RELATIONSHIP, Statement of BIDDER'S QUALIFICATIONS and submit them in the bid package. The other documents (form of CONTRACT, SECTION 3 CLAUSE, etc.) will be required prior to issuing NOTICE TO PROCEED if you, as the Contractor, in fact, are the successful and accepted bidder on the project. The successful bidder will be required to furnish and pay for satisfactory performance, payment and defect bond or bonds or other acceptable forms of guarantee. Any addenda issued during the time prior to bidding are to be acknowledged in the proposal and in closing a contract, they will become a part thereof. For any information concerning any part of this proposed work, contact: Forrest Neal, Project Manager Redland Childers Architects, P.C. 413 W. 12th Street Ada, Oklahoma 74820 (580) 436-0770 Fax (580) 436-6320 The competency and responsibility of bidders will be considered in awarding the contract. The Owner shall have the right to reject any or all bids and to reject a bid not accompanied by required bid security, or other data required to be submitted with the bid, or to reject a bid which is in any way incomplete, irregular or non-conforming. It is the intent of the Housing Authority to award a contract to the lowest responsible bidder provided the bid does not exceed the funds available. The Housing Authority shall have the right to waive any informality or irregularity in any bid or bids and to accept the bid that, in its judgment, is in its own best interest. Attention is called to the provisions of equal opportunity and payment of not less than the minimum salaries and wages as set forth in the bidder's packet. This contract is subject to the conditions of Executive Order 11246, which prohibits discrimination in employment because of race, color, religion, sex or national origin on federal or federally assisted construction contracts. Instructions relative to compliance with Executive Order 11246 and Section 3 will be given at the pre-bid conference. This contract also is subject to the provisions of Title VI of the Civil Rights Act of 1964. No bid shall be withdrawn for a period of sixty (60) days subsequent to the opening of bids without the consent of the Housing Authority |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |