Similar Projects
Eleven 8 Apartments
Renovation - 64,100 SF
Design
Aurora, CO 80010

The Point at Nine Mile Station - Phase II
New Construction
Design
Aurora, CO 80014

Nine Mile Station Apartments
New Construction - 256,757 SF
Post-Bid
$10,000,000 CJ est. value
Aurora, CO 80014

BMC- Copperleaf
New Construction
Post-Bid
Aurora, CO 80015

Copperleaf
New Construction
Construction
$44,000,000 est. value
Centennial, CO

Littleton Village Condominiums
New Construction - 182,707 SF
Construction
Centennial, CO

Meadow Point Condominiums
New Construction
Pending Verification
Aurora, CO 80015

Aurora Crossroads
New Construction - 1,450,000 SF
Pending Verification
$92,000,000 est. value
Aurora, CO 80040

Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

The Reserve at Lone Tree / Lone Tree
New Construction - 322,069 SF
Post-Bid
$80,000,000 est. value
Aurora, CO 80040

The Clarkson
New Construction - 193,607 SF
Construction
$32,000,000 est. value
Englewood, CO 80113

Mcre Apartments
Renovation - 47,850 SF
Pending Verification
Aurora, CO 80011

Metro Center - Parcel A
New Construction
Design
Aurora, CO 80012

The Point Affordable Apartments
New Construction - 71,572 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Aurora, CO 80012

Maa Abilene Multi-Family
New Construction - 369,007 SF
Pending Verification
$10,000,000 CJ est. value
Aurora, CO 80012

Last Updated 08/02/2022 10:11 AM
Project Title

Englewood Station Apartments

Physical Address View project details and contacts
City, State (County) Englewood, CO 80110   (Arapahoe County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $114,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope consists of but is not limited to redevelopment of former Sports Authority site into a 303 unit residential development. As of August 2, 2022, a permit application has been filed with the City of Englewood Building Department and is under review. A general contractor has been selected. A firm timeline for construction has not been announced, but is expected to start third quarter 2022.

Details

4 Stories Above Grade, Apartments, 303 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents