Similar Projects
NBKC Bank
New Construction - 5,040 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Leawood, KS 66206

Take 5 Car Wash
New Construction - 4,131 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Shawnee, KS 66217

Fidelity Investor Center
New Construction - 8,489 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Overland Park, KS 66211

CarMax Remodel #7267
Renovation
Post-Bid
Wichita, KS 67207

Saentz Auto Storage And Maintenance Facility
New Construction - 2,500 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Kansas City, KS 66106

Eurotec Vertical Flight Solutions
Addition - 50,000 SF
Conception
Lawrence, KS 66044

Bank of America
New Construction - 4,495 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Overland Park, KS 66214

Discount Tire Tract
New Construction - 7,488 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Salina, KS

Two Building Development
New Construction - 20,707 SF
Design
$500,000 to $1,000,000 CJ est. value
Overland Park, KS

Azura Credit Union Development
Renovation - 5,000 SF
Design
Olathe, KS

Jett Trucking Maintenance And Storage Facililty
New Construction - 12,644 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Olathe, KS 66061

First Option Bank
New Construction - 8,250 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Overland Park, KS 66223

Camping World Facility
New Construction - 37,791 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Kansas City, KS 66111

Oak Star Bank Building
New Construction - 21,213 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Overland Park, KS

Sonoma Plaza Lot 10 Bank and Restaurant
New Construction - 7,550 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Lenexa, KS

Reported 01/27/2022 12:00 AM
Project Title

Valvoline Instant Oil Change

Physical Address View project details and contacts
City, State (County) Lawrence, KS 66046   (Douglas County)
Category(s) Commercial
Sub-Category(s) Bank, Vehicle Sales/Service
Contracting Method Bids by Invitation.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,100,000
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of vacant bank building and construction of a new instant oil change facility.

Details

Vehicle Sales/Service, 3,776 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation.
Division 08 - Openings, Metal Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Special Function Doors, Entrances and Storefronts, Windows, Special Function Hardware, Special Function Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Emergency Access and Information Cabinets, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment, Security, Detention, and Banking Equipment, Vault Equipment, Safe Deposit Boxes, Safes, Vault Ventilators, Teller and Service Equipment.
Division 12 - Furnishings, Art, Window Treatments, Specialty Casework, Bank Casework, Office Accessories, Rugs and Mats, Furniture, Office Furniture, Interior Planters and Artificial Plants.
Division 13 - Special Construction, Vaults, Security Vaults.
Division 14 - Conveying Equipment, Vehicle Lifts, Pneumatic Tube Systems.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents