Similar Projects
AC Replacement at Race Track Tower
Alteration
Bidding
Homestead, FL

New Water Cooler and Air Cooler Tube Bundle
Alteration
Bidding
Homestead, FL 33030

Weatherization Assistance Program - HVAC and Mechanical
Post-Bid
Less than $14,796 est. value
Miami, FL 33169

HVAC Chillers/Equipment and Water Treatment Services
Post-Bid
FL

Replace Chillers and Air Handlers, Multi-Facilities
Results
$500,000 to $1,000,000 est. value
Homestead, FL 33039

J041--Chiller 1 and 3 VSD Replacement
Results
Miami, FL 33125

HVAC and Mechanical Products
Term Contract
Post-Bid

J045--Services: CLC Re-Heat Replacement, Miami VA
Results
Miami, FL 33125

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Chiller Plant Services
Term Contract
Results
Miami, FL 33199

Homestead, ARB, FL HVAC IDIQ Sources Sought
Post-Bid
Homestead, FL

HVAC and Controls: Replace, Supply and/or Install
Results
Miami, FL

Chillers and Water Treatment Services
Post-Bid
FL

HVAC System Replacement - Police Department
Results
Miami Shores, FL 33138

Weatherization Assistance Program - HVAC and Mechanical
Post-Bid
$17,454 est. value
Miami, FL 33177

Reported 02/16/2022 12:00 AM
Project Title

D/B Back-Up Chiller to Support Chillers 4 and 5

Physical Address View project details and contacts
City, State (County) Miami, FL 33125   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall be required to furnish two (2) new Chillers Outdoor type. One of 400 Tons for AHU-1 and AHU-2 and another Chiller of 100 Ton for AHU-1 and AHU-7. Since most of the Chillers are manufactured by Trane, the MVAHS Operations preference is to continue with TRANE Manufacturer with a 5 Year warranty on the compressor OR approved equal. Chillers shall be approved for Outdoor type NEMA 3R enclosure with high saltwater/rustproof protection. Existing CMCC3 shall be replaced by a new Motor Control Center (MCC) as required for this project. Chiller 5A Pumps will be fed from the new CMCC3. All new outdoor electrical disconnect or equipment shall be provided with Stainless-steel enclosure. Chiller Pump disconnects and conduits shall be stainless-steel on the outdoor connections. Include structural steel support base for each Chiller. Chiller 4A will be fed by a different power source for more reliability. The new Chillers location will be located next to the existing Chillers 4 and 5 extending the existing structural support platform. Another possible location for new Chillers will be the roof of the Mechanical Room located in MEA-46 which would need concrete slab poured and roofing with stair access (Bid Option). Chiller 4A (Glycol cooled) set point temperature shall be 32-degree Fahrenheit and chiller 5A (Air cooled) setpoint temperature shall be 40-degree Fahrenheit.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents