Last Updated | 09/06/2022 09:31 PM |
Project Title | Countryside Estates Subdivision, Cedar Street (9th St. to South), 8th Street (Cedar Street to East), B Street (8th Street to 7th Street) Project |
Physical Address | View project details and contacts |
City, State (County) | Owen, WI 54460 (Clark County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $701,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Excavation, pond excavation, water main, sanitary sewer, storm sewer, geogrid, breaker stone, crushed aggregate base, curb and gutter, hot mix asphalt, erosion control, traffic control, and restoration. The work, in general, will include the approximate quantities and items listed below: Water Main (6" and 8") and Appurtenances 1,960 lf Sanitary Sewer (4" and 8") and Appurtenances 2,230 lf Storm Sewer (12", 15", and 18") and Appurtenances 850 lf Excavation 5,500 cy Geogrid 7,500 sy Breaker Stone Subbase (12") 2,450 cy Crushed Aggregate Base (9") 1,850 cy Concrete Curb and Gutter (30") 3,300 lf Riprap 50 sy Hot Mix Asphalt (3") 6,000 sy Traffic Control 1 ls Topsoil, Turf, Grasses, Erosion Mat 6,400 sy |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |