Similar Projects
OKI IT Network Equipment
Term Contract
Post-Bid

OKI IT Network Equipment
Term Contract
Post-Bid

EC McManis WWTP Blower Replacements
Alteration
Results
Frankfort, KY 40601

One (1) New 4WD Utility Tractor
Alteration
Results
Owensboro, KY 42303

Skid Steer & Excavators
Post-Bid
Erlanger, KY 41018

Recycling Roll-Off Bins and Trailer
Alteration
Results
Burlington, KY

Double Wall Exam Audiometric Test Suite
Post-Bid
Lexington, KY 40502

Outdoor Playground Equipment
Alteration
Results
Lexington, KY

Forklift
Post-Bid
Owensboro, KY

PAV HA 6th Floor Lab - RO System Upgrade BP-01 (Controls)
Alteration
Results
$60,000 est. value
Lexington, KY

Annual Pipe and Fittings
Term Contract
Post-Bid
Louisville, KY

Municipal Snow Plow Equipment (Road Department)
Term Contract
Results
Owensboro, KY

Dumpsters
Alteration
Post-Bid
KY

Bus Wash
Alteration
Results
Winchester, KY

Forklift
Alteration
Post-Bid
KY

Last Updated 07/21/2022 09:25 AM
Project Title

Kentucky Exposition Center/Kentucky International Convention Center Elevator and Escalator Repair/Replace 2 - Kentucky State Fair Board

Physical Address View project details and contacts
City, State (County) Louisville, KY   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025,
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a conference / convention center in Louisville, Kentucky. Conceptual plans call for the renovation of a conference / convention center. Kentucky Exposition Center/Kentucky International Convention Center Elevator and Escalator Repair/Replace 2 A detailed scope has not yet been determined This project is included in the city's 2022-2028 Capital Improvement Plan (CIP). As of July 20, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Construction Aids, Temporary Elevators.
Division 14 - Conveying Equipment, Operation and Maintenance of Conveying Equipment, Operation and Maintenance of Elevators.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm, Fire Detection and Alarm Interfaces, Fire Detection and Alarm Interfaces to Elevator Control.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents