Similar Projects
Sr 1001 Over Tributary To Susquehanna River - 5356779
Renovation
Conception
$325,000 est. value

Us 22/322 Pm
Infrastructure
Conception
$2,850,000 est. value

Indian Trail Road over Hokendauqua Creek
New Construction, Demolition
Design
$4,067,400 est. value
Northampton, PA 18067

Raubsville Road over Frey's Run
Renovation
Design
$2,495,000 est. value
PA

Bridge Overlay Bundle #2
Infrastructure
Bidding
$2,500,000 CJ est. value
Allen Township, PA 18067

Bridge Overlay Bundle #2
Infrastructure
Bidding
$2,500,000 CJ est. value
Allen Township, PA 18067

AutoZone #1400 / Bethlehem
New Construction, Infrastructure - 5,654 SF
Post-Bid
$1,500,000 CJ est. value
Bethlehem, PA 18015

AutoZone #1400 / Bethlehem
New Construction, Infrastructure - 5,654 SF
Post-Bid
$1,500,000 CJ est. value
Bethlehem, PA 18015

Replacement of Northampton County Bridge No. 225
Results
Bangor, PA 18010

Gracedale Nursing Home - Pedestrian Ramp
Results
Nazareth, PA 18064

D&L Trail Development (North Catasaqua Borough)
New Construction
Construction
$1,449,105 est. value
North Catasauqua, PA

2022 36 Minsi Trail Siphon South Access Improvements
Infrastructure
Construction
$77,400 CJ est. value
Bethlehem, PA 18018

River Pointe Logistics
New Construction, Infrastructure - 6,000,000 SF
Pending Verification
$3,222,000,000 CJ est. value
Mount Bethel, PA 18343

Broad Street Mixed Use Building
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Bethlehem, PA 18018

I-78 - Easton Rd to SR 33
Infrastructure, Renovation
Conception
$21,935,774 CJ est. value
Bethlehem, PA 18015

Last Updated 08/08/2022 03:31 PM
Project Title

Nor-Bath Trail Improvements - Phase 3

Physical Address View project details and contacts
City, State (County) Bethlehem, PA 18017   (Northampton County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 08, 2022, no bids were received, no information for rebid.** Improve and Update the Nor-bath Trail in Allen Township and East Allen Township, Northampton County. The Rehabilitation of the Existing Trail Will Include Pedestrian Bridge Rehabilitation and Repairs, New Surfacing, and Fencing.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents