Similar Projects
Wash House Roof Restoration (Eastern Bus Division)
Alteration
Post-Bid
Baltimore, MD 21224

METRO Wabash Maintenance Facility Roof /HDN Repairs
Alteration
Post-Bid
$100,000 est. value
Baltimore, MD 21215

Roof Replacement Services
Alteration
Results

South Pavilion Roof Replacement
Alteration
Results
$100,000 to $500,000 est. value
Baltimore, MD 21215

Flat Roofing Replacement Services for 2800 West Patapsco Avenue
Renovation
Post-Bid
$126,000 CJ est. value
Baltimore, MD 21230

Southeast Community Action Center Roof Replacement
Alteration
Results
$1,000,000 to $2,000,000 est. value
Baltimore, MD 21202

Roof Repair and Maintenance at BWI Thurgood Marshall and Martin State Airports
Term Contract
Post-Bid
$300,000 CJ est. value
Baltimore, MD 21202

Roof Replacement at Walbrook Building 411
Renovation
Results
$6,899,000 CJ est. value
Baltimore, MD 21216

Roof Maintenance Contractors
Term Contract
Post-Bid
Baltimore, MD 21202

Roof Replacement at Federal Hill Preparatory Preparatory Pre-K To 8 School 045
Term Contract
Results
Baltimore, MD 21230

Southwest Police Station Roof Replacement
Renovation
Post-Bid
$1,000,000 CJ est. value
Baltimore, MD 21223

Roof Replacement
Alteration
Results
Jessup, MD 20794

Northwood Library Branch Roof Replacement
Alteration
Results
$500,000 to $1,000,000 est. value
Baltimore, MD 21218

Hamilton Branch Library Roof Replacement
Infrastructure
Results
$500,000 to $1,000,000 est. value
Baltimore, MD 21214

Roofing System Maintenance and Repair Service
Renovation
Results
$4,723,750 CJ est. value
Baltimore, MD 21202

Last Updated 05/04/2023 05:34 PM
Project Title

Roof Replacement at Morrell Park PreK-8 School 220

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21230   (Baltimore City County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,710,824 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Roof Replacement at Morrell Park PreK-8 School 220 MBE Participation (%) 25.0 African American MBE Participation (%) 8.0 Women-Owned MBE Participation (%) 11.0 Socio Economic Participation Criteria IFB-23048 Location of Work: Morrell Park PreK-8 School #220 2601 Tolley Street Baltimore, MD 21230. Questions Due: February 24, 2023 by 4:00 p.m The Work of Project is defined by the Contract Documents and consists of the following: 1. The scope of work will replace the entire built up roof with a new 0.80 TPO roof,with a new 0.80 TPO roof, using tapered insulation for proposed 1/4 " per foot slope as required. Insulation boards - flat and tapered will be utilized to attain as much od an R-30 insultaion rating as possible.. The roof replacement includes all flashing and accessories, metalwork, drains, coping, necessary The roofing will be covered by a minimum 20 year "Total System, No Dollar Limit" warranty. Curbs and flashing will be coordinated as needed with existing conditions. Roof drains, associated piping, and vandal proof strainers will be replaced. All gutters and downspouts will be replaced. Unless new, equipment on the roof will be replaced, including but not limited to gravity vents, exhaust fans (including electric), roof hatches, boiler and heater stacks.

Details

2 Stories Above Grade, 42,700 SF.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents