Similar Projects
Building Roof Repair
Post-Bid
Royal Oak, MI 48073

Roof Program 2020
Post-Bid
Troy, MI

Duck Lake Center Roofing Repair Package 2019
Results
Less than $20,495 est. value
Highland, MI 48356

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

2019 Bond Projects – Bid Package 2 – 2020 Roof Replacement Program
Post-Bid
Walled Lake, MI 48390

2020 School Roofing Replacement
Results
Royal Oak, MI

Roofing 2 Locations- Bid Pack 14
Post-Bid
Farmington, MI

Scotch Elementary Roof Replacement
Results
Less than $83,500 est. value
West Bloomfield, MI 48324

Roofing Replacement Project- LHS
Post-Bid
Madison Heights, MI

2020 Partial Roof Replacement
Results
Auburn Hills, MI

Orion Parks - Roofing and Siding
Post-Bid
Lake Orion, MI

Maple Forest Well House Roof Replacement 2020
Results
Wixom, MI

Dairy Barn Roof Reconstruction Project and Equipment Barn Project
Post-Bid
Rochester Hills, MI 48306

Roof Replacement Project
Results
Berkley, MI 48072

FPE: Roofing
Post-Bid
Pontiac, MI 48341

Last Updated 11/23/2020 06:02 PM
Project Title

Roof Replacement at Borden Park - Soccer Shelter

Physical Address View project details and contacts
City, State (County) Rochester Hills, MI 48307   (Oakland County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Roof is approximately 730 square feet 2. Remove and replace damaged wood supporting roof 3. Remove and replace asphalt shingle 4. Remove the existing roof material down to the decking and dispose of it properly 5. Some fascia needs replacement on the east and west side fascia of the structure 6. Replacement of at least one deteriorated board on the decking 7. Cost to replace additional decking boards if needed 8. Ice and weather shield membrane need to be installed along all the edges of the roof. 9. Vapor barrier membrane (synthetic or felt material) shall cover the entire roof. 10. Drip edging shall be installed around the entire structure 11. Thirty (30) year asphalt dimensional shingles must be used and installed to manufacturer specifications; color shall be selected by the City 12. Contractor to perform the work in accordance with the warranty requirements of the manufacturer and present the manufacturer’s warranty to the City prior to final payment. 13. Area shall be cleaned of all debris upon completion of the project 14. A minimal 5 year contractor warranty shall be given to the city

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents