Similar Projects
Road Re-paving Project
Infrastructure
Bidding
$2,600,000 est. value
Chippewa Falls, WI 54729

Cornell 8th Street Resurfacing
Infrastructure
Bidding
Cornell, WI 54732

2021 LRIP Road Improvements
Post-Bid
New Auburn, WI 54757

Lift to Road
Infrastructure
Post-Bid
Bloomer, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Anson 105th Avenue Resurfacing
Results
Jim Falls, WI

Culvert Installation
Infrastructure
Post-Bid
WI 54724

C. Chippewa Falls, Seymour Cray SR Blvd., CTH I Intersection
Results
Chippewa Falls, Seymour, WI

Road Work
Infrastructure
Post-Bid
Bloomer, WI 54724

Spring and River Street Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Crack Sealing
Infrastructure
Post-Bid
Bloomer, WI 54724

Cedar Street Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Blacktop
Infrastructure
Post-Bid
Holcombe, WI

Bridgewater Avenue Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Roadwork
Infrastructure
Post-Bid
Bloomer, WI

Reported 06/23/2022 12:00 AM
Project Title

Overlay and Chip Seal

Physical Address View project details and contacts
City, State (County) Bloomer, WI   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Town Board of the Town of Bloomer, Chippewa County, Wisconsin will be accepting road bids for the following 2 inch overlay on 80th St. approximately 1.5 miles Roads will be marked. Bids should include shouldering. The hot mix should be compressed asphalt with a depth of 2in and a width of the entire road. All mailboxes and driveways shall be winged out with asphalt. Quote price per ton, tonnage, and total cost. Chip Seal from St HWY 40 east on 220th ave to 222nd ave then on 222nd ave to County HWY AA. Chip Seal from 210th ave North on 100th st to 220th ave. Road will be marked. For the roads to be chip seal coated, cracks larger than 1/4-inch are to be filled, patch localized-problem areas, sweep before applying liquid asphalt, and sweep after rolling aggregate to remove excess aggregate. Road surface must be dry before application, no rain predicted during application or setting time, humidity must be less than 75%, must specify aggregate size and asphalt application rate in the bid.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents