Similar Projects
Construction of Grand Mission Regional Detention System Maintenance
Post-Bid
$600,000 est. value
TX

Dry Creek Regional Detention Pond Phase 2
Post-Bid
$844,430 est. value
Rosenberg, TX

Exploration Green Detention Facility Phase 3A
Results
Less than $5,520,000 est. value
Clear Lake City, TX 77058

Harvey Disaster Recovery Repairs at the Clear Creek Bayou, Armand Bayou and Sims Bayou Watersheds
Results
Less than $1,195,000 est. value
TX

Police Training Facility - Berm Improvements
Construction
Less than $2,200,000 est. value
Conroe, TX 77301

Water, Sanitary Sewer, Drainage, and Paving Facilities for Sterling Lakes Drive Street Dedication
Post-Bid
TX

Construction of Long Meadow Farms Section 46, Phase 1A Water, Sewer, and Drainage Improvements
Results
TX

Harvest Meadows Phase Two - Water, Wastewater and Drainage Improvements
Post-Bid
Buda, TX 78610

Water, Sanitary Sewer, and Drainage Facilities, Paving and Appurtenances to Serve Mustang Trails Section 3
Results
Less than $1,636,000 est. value
TX

Sims Bayou Harvey Repairs, Harris County, Texas
Post-Bid
TX

Construction of the Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Del Bello Section 1
Results
TX

Repair Seven (7) Drainage Pump Stations
Post-Bid
Port Arthur, TX

OP Schnabel Park Entrance and Bridge
Results
$783,000 est. value
San Antonio, TX

Seeling Channel Phase 3 Project
Post-Bid
$15,080,000 est. value
San Antonio, TX 78205

Bass Lodge Retaining Wall Repair at Daingerfield State Park
Results
$136,600 est. value
Daingerfield, TX 75638

Last Updated 05/19/2021 07:57 AM
Project Title

Hurricane Harvey Drainage Improvements Project

Physical Address View project details and contacts
City, State (County) Aransas Pass, TX   (San Patricio County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,032,332
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the installation of drainage improvements to include 900 lf of concrete-lined channel, 963 lf of 8’x3’ concrete box culvert, 1,656 lf of existing 42” RCP storm sewer line rehabilitation, asphalt pavement reconstruction, curb & gutter, junction boxes, inlets, removal of 900 lf of existing 42” CMP storm sewer line removal, 925 lf of existing 48” storm sewer line removal, and appurtenances in accordance to the contract documents, specifications, and plans.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents