Similar Projects
Last Updated | 02/24/2023 12:04 AM |
Project Title | Thomas M. Balliet Elementary School - Exterior Door and Window Replacement - Sub-bids |
Physical Address | View project details and contacts |
City, State (County) | Springfield, MA 01109 (Hampden County) |
Category(s) | Education |
Sub-Category(s) | Elementary School |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,567,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City of Springfield, the Awarding Authority, invites sealed bids from General Contractors for the Thomas M. Balliet Elementary School- Exterior Door and Window Replacement Project in Springfield, Massachusetts, The Project consists of:Replace all existing fixed / operable window units (in the 1947 building, non-gymnasium spaces) with new aluminum thermally broken window assemblies. Operable units, on the ground floor, shall be in-swing hopper type while the upper level windows shall be single hung. Existing clear finished interior trim to remain as-is. Provide exterior placed metal screens at all operable window locations. Provide pre-finished steel (side hinge operable) rock guards at all ground floor windows. Additionally, all windows in occupiable areas shall be provided with roller window shades. Replace existing window units in the Gymnasium with new fixed translucent fiberglass sandwich panel assemblies ; Replace all single leaf entry doors/frames with new fiberglass reinforced plastic doors (with aluminum skin facing) / pressed steel thermally-broken frame assemblies. Insulated glass vision lites will be provided at all door locations other than at mechanical and storage areas. Replace all paired entry doors/frames at building entrance locations with new fiberglass reinforced plastic doors (with aluminum skin facing) / pressed steel thermally-broken frame assemblies. Insulated glass vision lites will be provided at all door locations other than at mechanical and storage areas. Additionally, as appropriate, all new frames will be provided with insulated glass vision lites (to match existing lites). Provide new door hardware at all exterior door locations. ; Re-connect the existing access control system as relevant door locations. Thomas M. Balliet Elementary School - 52 Rosewell St Springfield, MA 01109 Bids are subject to minimum wage rates as required by M.G.L. c.l49 to 27H inclusive. General bidders must be certified by the Division of Capital Asset Management and Maintenance (DCAMM) in the following category of work ; General Building Construction and must submit a current DCAMM Certificate of Eligibility and signed DCAMM Prime Update Statement (Form CQ 3). Sub-bid RFI will be received until 1/18/2023 at 4:00pm. The work is estimated to cost $1.2M Filed sub-bidders must be DCAMM certified for the trades listed below and bidders must include a current DCAMM Sub-Bidder Certificate of Eligibility and a signed DCAMM Sub-Bidders Update Statement.The City of Springfield supports the goal of twenty percent minority and women participation in all contracts. No questions will be answered unless received by the Chief Procurement Officer at least 7 days prior to the expiration of the time set for submitting bids or proposals. The Chief Procurement Officer reserves the right to waive any informality in and to reject any or all bids if it is in the public interest to do so. General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (considering all alternates), and made payable to the City of Springfield. **Filed Sub-Bid 01/25/2023 at 2:00 PM ET *Additional sets may be purchased for $300. Bidders requesting Contract Documents to be mailed to them shall include a separate check for $40.00 per set for UPS Ground (or $65.00 per set for UPS overnight), payable to BidDocs ONLINE, Inc., to cover mail handling costs. MBE (4.2%), WBE (8.8%) Construction 06/19/23 to 09/01/23 |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |