Similar Projects
Air Park Recreation Center Replacement Facility - City of Lincoln
Addition, Infrastructure
Conception
$933,182 CJ est. value
Lincoln, NE 68524

Multi Modal Center - City of Lincoln
New Construction, Infrastructure
Conception
$528,979 CJ est. value
Lincoln, NE 68508

Compressed Natural Gas (CNG) Fueling Station
New Construction, Infrastructure
Design
$4,481,919 CJ est. value
Lincoln, NE 68508

Monolith Materials Anhydrous Ammonia Plant - Phase 2
Addition, Demolition, Renovation, Infrastructure
Design
$1,000,000,000 CJ est. value
Hallam, NE 68368

SCC IT Tower Facility and Science Tower CM Proposals
Addition
Post-Bid
Lincoln, NE 68520

Arnold Heights Concrete - 2022
Infrastructure
Post-Bid
$30,000 CJ est. value
Lincoln, NE 68508

Andersen Hall Convert Room 229 to TV Studio-13507
New Construction
Results
Lincoln, NE 68508

Food Industry Complex New Building Entrance
Renovation
Results
$500,000 est. value
Lincoln, NE 68503

Southeast Community College Residence Hall - Lincoln Campus
New Construction, Infrastructure - 89,780 SF
Construction
$25,000,000 CJ est. value
Lincoln, NE 68520

South 59th Circle Mixed-Use / Lincoln
New Construction, Infrastructure - 130,000 SF
Pending Verification
$60,000,000 CJ est. value
Lincoln, NE 68516

17th & Holdrege Transformer #2 - SUB410 - City of Lincoln
New Construction, Infrastructure
Pending Verification
$3,204,000 CJ est. value
Lincoln, NE 68508

20th & Pioneers Substation Replace Transformer - 0693 - City of Lincoln
New Construction, Infrastructure
Conception
$1,064,000 CJ est. value
Lincoln, NE 68502

New Central Library - City of Lincoln
New Construction, Infrastructure
Design
$45,000,000 CJ est. value
Lincoln, NE 68508

Southeast Community College Healing Gardens Lincoln Campus
Infrastructure
Post-Bid
$200,000 CJ est. value
Lincoln, NE 68508

Construction Manager at Risk - Architecture Complex Renovation Phase 2
Renovation
Results
$11,393,000 est. value
Lincoln, NE 68588

Last Updated 07/24/2023 04:13 PM
Project Title

Barkley Memorial Center Expansion and Renovation - Sub-contracting Services

Physical Address View project details and contacts
City, State (County) Lincoln, NE 68503   (Lancaster County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2021 , Construction documents
Bids Due View project details and contacts
Estimated Value $6,925,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Beckenhauer Construction, Inc. is now accepting qualifications/proposals for sub-contracting services for the UNL Barkley Memorial Center Expansion and Renovation project. Specific trades that Beckenhauer Construction is interested in for this solicitation are as follows: Demolition, General Trades & Miscellaneous (Includes Material, Labor & Equipment Unless Noted Otherwise), Finish Carpentry (Unload, Storage, Handling, Labor & Equipment), Architectural Wood Casework (Material Only), Foam-in-Place Insulation, EIFS, Metal Wall Panels, Membrane Roofing, Fireproofing, Caulking and Sealants, Building Expansion Joint Systems, Personnel Doors, Frames, And Hardware (Material Only - F.O.B. Jobsite), Storefronts, Curtainwalls and Glass, Tiling, Ceilings, Flooring, Painting & Coating, Wall & Door Protection (Material Only - F.O.B. Jobsite), Toilet, Bath & Laundry Specialties (Material Only - F.O.B. Jobsite), Facility Fall Protection Devices (Material Only - F.O.B. Jobsite), Window Treatments, Countertops, Elevators, Escalators and Moving Walks, Termite Treatment and Pavement Specialties. 1/12/2021 05:00:00 PM (CT) Bidder Questions Deadline In order to be given consideration, any questions or requests for bid interpretation must be sent to Beckenhauer Construction, Inc. received no later than this date/time. Questions must be submitted to jberan@beckenhauerconstruction.com. 1/15/2021 05:00:00 PM (CT) Response to Bidder Questions Deadline Responses to all submitted questions will be documented in this system via formal Addendum by the deadline date.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents