Similar Projects
Reported | 12/01/2021 12:00 AM |
Project Title | Golfview Flooding Relief Capital Improvement Project - Engineering Design |
Physical Address | View project details and contacts |
City, State (County) | Tampa, FL (Hillsborough County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide topographic survey necessary for the design of the project. The design project shall include but is not limited to, permitting, utilities, SUEs, Geotech, and any other item pertinent to the delivery of a 100% design plan set, for a major stormwater trunk line and various transmission and distribution water pipelines. The stormwater related work consists of the design of approximately 4400 linear feet of RCP, trunk line, laterals, inlets and associated utility relocation, commencing at the stubbed pipe provided at the eastern terminus of Dale Mabry and Watrous Avenue FDOT project and terminating at the intersection of Himes Ave and McKay to the North and Almeria and Jean Circle to the South. The water pipeline related work consists of the design of approximately 2300 linear feet of 24” DIP and various smaller distribution pipeline incidentals. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |