Similar Projects
Draft: Bardwell Lake Park Cleaning Services
Term Contract
Design
$500,000 to $1,000,000 est. value

Horizontal Chill Water Blower Coil Units
Term Contract
Design
San Antonio, TX 78205

FY18 Vehicle Maintenance Shop, Camp Bullis
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
San Antonio, TX 78257

RFQ - Civil Engineering Services for the 2022-2027 General Obligation Bond Program
Term Contract
Bidding
San Antonio, TX 78205

Make Ready Services for Costa Valencia, Cottage Creek, and Rosemont at Highland Park
Term Contract
Sub-Bidding
San Antonio, TX 78205

2023 Street Rehabilitation Task Order Contract Package 5 (Reconstruction)
Term Contract
Sub-Bidding
$5,000,000 CJ est. value
San Antonio, TX 78205

Annual Contract for BESD Window Cleaning Services
Term Contract
Post-Bid
San Antonio, TX

Generator Preventative Maintenance and Repair Service
Term Contract
Post-Bid
San Antonio, TX

Grease Trap Services
Results

Job Order Contracting (Joc) Program
Results
$96,000,000 est. value
TX

Hooten Tract
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
San Antonio, TX 78205

RFP - Construction Engineering Inspection (CEI); San Antonio District; IH-35 Northeast Expansion (NEX) South from south of the IH-35/I-410 interchange to North Walters Street
Term Contract
Bidding
San Antonio, TX 78205

Electrical and Plumbing Services
Term Contract
Sub-Bidding
San Antonio, TX 78205

South East Clinic AHU Replacement Project
Term Contract
Post-Bid
San Antonio, TX 78223

Power Washing Services of Gas Degiser Tank
Alteration
Results
$26,000 est. value
San Antonio, TX 78212

Last Updated 08/03/2022 12:51 AM
Project Title

2022-2023 TOC for Flatwork and Street Improvements Package 3

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78205   (Bexar County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Maintenance, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $5,200,207 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For 2022-2023 TOC for Flatwork and Street Improvements Package 3 The Deadline for questions is scheduled for July 5, 2022 at 4:00 P.M. CT. The bidder acknowledges that this is a unit price contract; that unit prices established will remain in effect and valid throughout the duration of the contract; the quantities shown are estimated quantities for budgetary purposes only; the award of this contract does not guarantee contractor the entire work shown in this FORMAL INVITATION FOR BID (IFB); the City may order all, some, or none of the work shown in this IFB; and projects will be assigned as they become available. The City of San Antonio point of contact for this solicitation is Desiree Alderete 010 Invitation for Bids 020 Contract Signature Page 040 Standard Instructions to Respondent 041 Certificate of Interested Parties (TEC Form 1295) 095 SAWS Special Conditions 050.01 SBEDA Guidelines Subcontractor/Supplier Utilization Commitment Form 060 Supplemental Conditions 075 Performance Bond 076 Payment Bond 081 General Conditions for Construction Contracts 095 SAWS Special Conditions Subcontractor/Supplier Utilization Commitment Form Wage Decision Insurance Requirements The bidder understands and agrees to the responsibility for obtaining any and all addenda and adhering to all requirements in addenda(s). City is not responsible for incorrect information obtained through other sources It is understood and agreed that the work is to be substantially completed on or before 450 calendar days. This project does not include hazardous environmental work. This project requires 2 project sign(s). Small Business Economic Development Advocacy (SBEDA) Program - Respondents shall meet the subcontracting requirements as stated on 050.01 Form and on the Subcontractor/Supplier Utilization Commitment Form posted with this solicitation on the Citys website. Wage Decision - Respondent shall meet the prevailing wage rate requirements established for this contract and shall reference the wage decision posted with this solicitation on the Citys website

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents