Similar Projects
Synergy Center
New Construction - 92,700 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Joppa, MD 21085

Synergy Center
New Construction - 92,700 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Joppa, MD 21085

Village at Blenheim Run
New Construction
Design
$1,000,000 to $5,000,000 CJ est. value
Havre de Grace, MD 21078

I-95 Logistics Center
New Construction - 2,052,200 SF
Design
$10,000,000 CJ est. value
Abingdon, MD 21009

Walmart 0-1--TENANTBID--2021 - Bundle#1
Renovation
Bidding by Invitation

At Home
Build-Out - 87,350 SF
Sub-Bidding
Abingdon, MD 21009

Aldi #44 Bakery
Renovation
Post-Bid
Aberdeen, MD 21001

The Edge At Middelton
New Construction
Post-Bid
Aberdeen, MD 21001

Carsins Run at Eva-Mar
New Construction
Construction
$100,000,000 est. value
Bel Air, MD 21015

Carsins Run at Eva-Mar
New Construction
Construction
$100,000,000 est. value
Bel Air, MD 21015

Starbucks
New Construction
Pending Verification
Federal Hill, MD

General Contractor Storage Building
New Construction - 3,200 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Havre de Grace, MD 21078

Appliance Drive Warehouse
New Construction - 269,180 SF
Conception
$10,000,000 CJ est. value
Bel Air, MD

Foster's Branch At Ridgely's Reserve
New Construction
Design
Bel Air, MD 21085

Target #1002 - Grocery Pick-UP
Renovation - 500 SF
Post-Bid
Bel Air, MD 21014

Last Updated 09/22/2020 11:57 AM
Project Title

James Run Mixed Use

Physical Address View project details and contacts
City, State (County) Belcamp, MD 21017   (Harford County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Food/Beverage Service, Hotel/Motel, Multi-Family Homes, Office, Parking Garage, Retail, Swimming Pool(s)
Contracting Method General Contractor to Subcontract.
Project Status Construction Commenced second quarter 2020, Construction Completion Expected April 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

11 office and retail buildings, a 125-room hotel, 300 apartments in six buildings, 191 villas and 87 townhouses

Details

Retail, 11 Office, New Construction, Multi-Family Homes, 191 Unit(s), Multi-Family Homes, 87 Unit(s), 111 Acres, Hotel/Motel, 125 Unit(s), 6 Apartments/Condominiums 300 Unit(s), Swimming Pool(s), Clubhouse/Social Club, Parking Garage, 2 Buildings, Food/Beverage Service, Food/Beverage Service.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents