Similar Projects
East Saint Paul Avenue Mixed Use
New Construction
Conception
Waukesha, WI 53186

Olympia Fields Multi-Use Development
New Construction
Design
Oconomowoc, WI 53066

Weas Development Mixed-Use Development
New Construction
Design
Menomonee Falls, WI 53051

STH 16, 5,800' West of STH 83 STH 190
Infrastructure
Bidding
$3,000,000 CJ est. value
Nashotah, WI 53058

STH 16, 5,800' West of STH 83 STH 190
Infrastructure
Bidding
$3,000,000 CJ est. value
Nashotah, WI 53058

Creekwood Apartments
New Construction
Sub-Bidding
Menomonee Falls, WI 53052

Town Hall Drive Reconditioning
Renovation
Post-Bid
Eagle, WI

Asphalt Concrete Paving - County Highway System
Infrastructure
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Local Road Maintenance
Results
WI

Woodnote Residences
New Construction - 40,000 SF
Construction
Hartland, WI 53029

The Village At Fox River
New Construction
Construction
Waukesha, WI

Saylesville Road Apartment Complex
New Construction - 30,569 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Waukesha, WI 53189

National Heritage Academies / Waukesha
New Construction, Infrastructure - 45,000 SF
Pending Verification
$9,500,000 CJ est. value
Waukesha, WI 53189

Venturespace Commercial Condominiums
New Construction - 30,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Menomonee Falls, WI 53051

Last Updated 09/09/2022 09:07 AM
Project Title

Tower Ridge Apartments

Physical Address View project details and contacts
City, State (County) Oconomowoc, WI 53066   (Waukesha County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2019
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of an apartment building with 32 parking stalls in the building, plus 15 spots in the detached garage and another 36 at the surface for a total of 83. As of May 28, 2019, an architect has been selected, however the status of design has not been confirmed. Information regarding the selection of a general contractor has not been provided. Although a firm construction timeline has not been established, the owner hopes to have the building completed by January or February 2020. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3 Stories Above Grade, Parking Spaces, 83 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents