Similar Projects
Campus Greenhouse Steam & Condensate Line Replacement
Renovation
Results
$76,501 CJ est. value
Laramie, WY 82071

Old Town Water System Rehabilitation Phase 2
Infrastructure
Bidding
$2,600,000 CJ est. value
Hanna, WY 82327

Northern Arapaho Business Council Industrial Park Lift Station
Demolition, New Construction, Infrastructure
Results
$321,300 CJ est. value
Arapahoe, WY 82501

RFQ D/B - Design-build Services of Central High School Riske Field Track Replacement
Infrastructure
Post-Bid
$38,670 CJ est. value
Cheyenne, WY 82009

Transfer Station Lift Station Upgrade or Replacement
Renovation
Post-Bid
$2,000,000 CJ est. value
Cheyenne, WY 82007

Plumbing Contractor Services
Term Contract
Post-Bid
Cheyenne, WY 82001

Air Compressor and Installation
Renovation
Sub-Bidding
$50,000 CJ est. value
Cheyenne, WY 82001

Stadium Plumbing Upgrade
Alteration
Post-Bid
Casper, WY 82601

Casper Regional Landfill Leachate Force Main Extension
Infrastructure
Results
$174,038 CJ est. value
Evansville, WY 82636

As Needed Minor Plumbing Repairs, Maintenance, Servicing, Diagnostics, Inspections and/or Certification at Thyra Thomson Building
Term Contract
Post-Bid
Casper, WY 82601

Replace 4 Water Heaters at Cody Middle School (CMS)
Renovation
Design
$200,000 CJ est. value
Cody, WY 82414

Scott A Mohror
Infrastructure
Post-Bid
$330,000 CJ est. value
Jackson, WY 83001

Last Updated 02/10/2023 04:32 PM
Project Title

North Heights Waterline Replacement Phase II

Physical Address View project details and contacts
City, State (County) Sheridan, WY 82801   (Sheridan County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,849,015 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Base Bid includes the replacement of all ductile iron water mains for the North Heights Waterline Replacement Phase II project. Construction shall include a total of 4,027 LF of 8" PVC mainline, 388 LF of 12" PVC mainline, 101 service connections, one connection into the 12" mainline, two future stub outs, abandonment of the existing main, and restoration of all surfacing to original condition. Temporary water shall be supplied to residents at all times as well as traffic control to ensure safe travel of local traffic. Contractors, in submitting their respective bids, acknowledge that such bids conform to all requirements of Wyoming State Statute. Each bidder must include a bid security with the bid, payable to the City of Sheridan, in accordance with the Instructions to Bidders. No bidder may withdraw its bid after the scheduled time of the bid opening. Bids are to remain open for 60 days after the bid opening. The Owner reserves the right to reject any and all bids or parts thereof, and to waive any irregularities of any bid. The Owner also reserves the right to award the contract to such responsible bidders as may be determined by the Owner. Qualified Disadvantaged Business Enterprises (DBEs) are encouraged to submit bids on this project. Bidders that use a subcontractor(s)/supplier(s) are required to make a good faith effort at soliciting DBE subcontractor/supplier participation. Bidders shall submit the required DBE Good Faith Effort Documentation form and other related forms with their bids. Pursuant to W.S. 16-6-106, "preference is hereby given to materials, suppliers, agricultural products, equipment, machinery and provisions produced, manufactured or grown in Wyoming or supplied by a resident of the state, quality being equal to articles offered by the competitors outside of the state"

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents