Similar Projects
Plant Wall Reconstruction
Infrastructure, Alteration
Bidding
Castle Rock, CO

UFAS/ADA Interior and Exterior Modernization
Alteration
Bidding
$225,000 est. value
Colorado Springs, CO 80916

Paired Panel Operable Wall Partitions
Post-Bid
Glenwood Springs, CO 81601

KOA Tuck Pointing
Post-Bid
Less than $40,000 est. value
Aurora, CO 80011

Y--Grand Valley Open OHV Staging Area Ph. 2
Results
$100,000 to $200,000 est. value
Grand Junction, CO

SPR Exterior Envelope Repairs
Results
Englewood, CO 80110

Exterior Restoration and Rehabilitation
Construction
Saguache, CO 81149

Exterior Modernization at the Katherine Bates Apartments
Post-Bid
Colorado Springs, CO 80904

Stucco Repair and Recoat Project
Results
Castle Rock, CO 80104

Wastewater Treatment Plant Handrail Replacement Project
Post-Bid
Craig, CO 81625

Charles Whitlock Recreation Center Facade Repairs
Results
Lakewood, CO

Decking For House
Post-Bid
Brighton, CO 80601

Boulder County Housing Authority Exterior Repairs
Results
Boulder, CO 80306

Notice 21-10-UCB000276-Site-Paver Maintenance & Repair
Post-Bid
Less than $125,000 est. value
Boulder, CO

Stucco Rehabilitation at the Recreation Center
Results
Longmont, CO 80501

Reported 02/28/2022 05:03 AM
Project Title

Adams County Detention Facility Building Exterior Skin Replacement

Physical Address View project details and contacts
City, State (County) Brighton, CO 80601   (Adams County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes removal of 3-coat Stucco and EFIS finish, damaged insulation, flashings, copings, and other transitional materials currently attached to an existing CMU exterior wall. The replacement area covers exterior walls with various heights, surface areas and expansion joints. The exterior skin replacement is proposed to be metal panel with sections of colored highlights to enhance the look and aesthetics of the Detention Facility Campus. Building’s A-F have reported deterioration, discoloration, blistering and failure due to age and migrating bird infestation and pecking at the surface causing years of maintenance patching and repairs to address areas of failure.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents