Similar Projects
Replacement of Central Cooling System Equipment and Piping
Post-Bid
Waterbury, CT

HVAC Equipment Preventative Maintenance
Term Contract
Post-Bid
Woodbridge, CT 06525

Replacement of the Air Handling Units at Amity Regional High School
Results
Less than $644,000 est. value
Woodbridge, CT 06525

Mini-Split AC/Heat Pump Installations, 6 Locations in CT
Results
Colebrook, Middlebury, Stamford, Thomaston, CT 06905

HVAC Services
Post-Bid
New Haven, CT

Service to the Cooling Tower
Results
Waterbury, CT 06702

Hoffman Pentair Enclosure Cooling Air Conditioner Model G280646G100
Post-Bid
Wallingford, CT 06492

HVAC Services - Emergency, On Call and Preventative Maintenance
Term Contract
Results
New Haven, CT

HVAC Systems Repair and Maintenance Services
Post-Bid
New Haven, CT

126 Heat Pumps At Monsignor Hynes Apartment
Results
Less than $126,100 est. value
Ansonia, CT

J045--Sources Sought Facility Repairs West Haven Connecticut
Post-Bid
West Haven, CT 36C24121Q0

Jonathan Law High School HVAC Upgrades
Results
Milford, CT 06460

Repair of a Trane Roof Top Model WSC090E4RKA 7.5 Ton Roof Top Unit
Post-Bid
Wallingford, CT

On Call Duct Cleaning Services
Term Contract
Results
New Haven, CT

City Hill Middle School (CHMS) Replacement of 3 AHU/CU's
Post-Bid
Naugatuck, CT 06770

Last Updated 08/18/2021 02:14 PM
Project Title

HVAC Upgrades SPB Water Pollution Control Facility

Physical Address View project details and contacts
City, State (County) Waterbury, CT 06708   (New Haven County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacing four air handling units and two air conditioning units in the process areas of the Sludge Processing Building as well as replacing all the hot water unit heaters in the entire building. The Automatic Temperature Controls associated with the replaced equipment (which currently is pneumatic) will also be replaced with a direct digital based controls. Another area of this project will be installing CMU partitions and doors to prevent the migration of H2S gas into other areas of the building. Various hollow metal doors will be replaced with fiberglass doors and high density strip curtains will be installed on the south side of the Belt Filter Press platform to better contain the H2S in order for it to be removed by the Odor Control system.

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 07 - Thermal and Moisture Protection, Firestopping, Joint Sealants.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents