Similar Projects
David G. Burnet Elementary School - Renovation
Renovation
Bidding
$6,412,034 CJ est. value
Dallas, TX 75220

Stinson 9/27 Sealant and Threshold Failure Repair
Infrastructure
Bidding
$1,900,000 CJ est. value
San Antonio, TX 78214

Concrete Spall Repair - US 59
Infrastructure
Sub-Bidding
$5,181,500 CJ est. value
Texarkana, TX 75503

Full Depth Concrete Repair - US 75
Infrastructure
Sub-Bidding
$339,600 CJ est. value
McKinney, TX 75069

Annual Requirements Contract for Concrete Materials
Term Contract
Post-Bid
Arlington, TX

Millwood Switch Cable Trench (GP and L)
Alteration
Post-Bid
Garland, TX

Concrete/Cement
Alteration
Results
TX

Drainage Products - Reinforced Concrete
Term Contract
Results
TX

CCC Cabin #11 Erosion Control at Bastrop State Park
Infrastructure
Bidding
$500,000 CJ est. value
Bastrop, TX 78602

Agrilife Phenotyping Greenhouse Concrete Pad
Infrastructure
Sub-Bidding
$29,000 CJ est. value
College Station, TX 77845

Concrete
Alteration
Post-Bid
Celina, TX

GP and L Elm Grove Substation Precast Cable Trench
Alteration
Results
Garland, TX

Artificial Turf Field
Infrastructure
Bidding
$53,000 CJ est. value
San Antonio, TX 78205

District Wide Concrete Work (Re-Bid)
Alteration
Post-Bid
Burnet, TX 78611

2022 Miscellaneous Concrete Repair - Various Locations
Term Contract
Results
Garland, TX

Last Updated 07/06/2023 04:01 PM
Project Title

Aubrey ISD New Elementary School #4

Physical Address View project details and contacts
City, State (County) Aubrey, TX 76227   (Denton County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $33,300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

A construction manager has been selected. The prior solicitation below is for historical reference purposes only. This Request for Qualifications (RFQ) contains information and instructions to enable interested Proposers to prepare and submit a Qualifications Submittal and Cost Submittal (Step-2 Only) as well as information on the selection process. Construction to Start 4/1/2023 Substantial Completion 6/1/2024 Facility to Open 8/1/2024 Cost Submittal Due, (Step 2) - 9/8/2022 by 2:00 PM Review/Select/Short-list - 8/15/2022 - 9/2/2022 Interview Firms on Short-list (If Necessary) - 9/12/2022 - 9/19/2022 Recommendation to School Board - 9/21/2022/2022 at 6:30 PM Qualifications Submittal and Cost Submittal (Step-2 Only) responses must be returned in sufficient time so as to be received and time stamped by the District on or before the time and date shown on this RFQ. It is the sole responsibility of the Proposer to ensure timely delivery of the Qualifications response. The District will not be responsible for failure of service on the part of the U.S. Postal Office, courier companies, or any other form of delivery service chosen by the Proposer. Receipt of any Addenda must be acknowledged by signing in the space provided on the attached Cost Proposal Certification Form to be enclosed with the Proposer's response. The Construction Manager at Risk (CM@R) will be selected via the two-step evaluation process. Name of bonding company and name and address of agent. Performance and Payment Bonds for 100% of the construction cost will be required upon submission of the guaranteed maximum price (GMP).

Details

101,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents