Similar Projects
CBERRRSA Snow Storage Site Development - PW2010002 - Municipality of Anchorage
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Anchorage, AK 99501

Chugiak-Eagle River Senior Center Phase II and III - MOD08311 - Municipality of Anchorage
Renovation, Infrastructure
Conception
$14,000,000 CJ est. value
Chugiak, AK 99567

11th Avenue/12th Avenue Area Road Reconstruction - East of Valley Street - PW2014080 - Municipality of Anchorage
Infrastructure
Design
$6,500,000 CJ est. value
Anchorage, AK 99501

Chester Creek Sports Complex - PW2012067 - Municipality of Anchorage
Infrastructure
Design
$11,500,000 CJ est. value
Anchorage, AK 99501

AMATS: Hiland Rd MP 0 To 3.2 Pavement Preservation
Infrastructure
Bidding
$5,000,000 CJ est. value
Anchorage, AK 99577

Priority Fairbanks Fast Track Bridges CMGC
Infrastructure
Bidding
$40,000,000 CJ est. value
Anchorage, AK 99503

Extend Runway 16/34 and Construct Two Supporting Taxiways
Infrastructure
Post-Bid
$250,000,000 CJ est. value
Anchorage, AK 99506

RFP D/B - Refuge Faunique National Izembek Design Build Services
Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Healy, AK 99743

LKSD William Miller Memorial School Partial Demolition Phase 3
Demolition, New Construction, Infrastructure
Results
$2,895,000 CJ est. value
Napakiak, AK 99634

Electron Drive Crossing Upgrades
Infrastructure
Results
$104,200 CJ est. value
Anchorage, AK 99518

Birch Meadow Subdivision
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Anchorage, AK 99504

Birch Meadow Subdivision
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Anchorage, AK 99504

Ted Stevens Anchorage International Airport UPS Expansion
Addition, Infrastructure - 1,350,000 SF
Pending Verification
$110,000,000 CJ est. value
Anchorage, AK 99501

Alaska Native Cultural Charter School
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Anchorage, AK 99501

Reeve Boulevard Street Maintenance Facility - PW2012058 - Municipality of Anchorage
New Construction, Infrastructure
Conception
$2,300,000 CJ est. value
Anchorage, AK 99501

Last Updated 04/11/2023 02:05 AM
Project Title

Bethel Heights Releveling

Physical Address View project details and contacts
City, State (County) Bethel, AK 99559   (Bethel County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $487,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

AHFC is seeking bids to repair, replace and install components on individual structures in Bethel as outlined in the Summary of Work/Specifications. Project completion for Phase 1 must be completed no later than end of October 2023. Question Deadline and Submittal location: March 23, 2023 until 4.00 PM EMAIL: submittals@ahfc.us. Estimated amount : $500,000 or greater Repair, replace and install components on individual structures as specified in Design Alaska's Schematic Design Bethel Heights Leveling Manual. See attached document. Phase one to include ten (10) properties that are the furthest out of level. Total project to include one hundred six (106) properties. Current goal is to acquire a single contractor for the below mentioned repairs and upgrades. Contract will be awarded based on Phase 1 bid, with the assumption that Phases 2 through 5 costs will be close in cost quantified only by an increase in properties. Phase 2-5 will have an estimated twenty four (24) units per phase Install Construction materials as specified by Design Alaska in Bethel Heights Leveling Manual. Contractor to acquire all necessary permits. Level each structure and install adjustable pile caps. Install pile caps at individually determined level extended within the Pile cap Bracket to compensate for freeze and thaw cycles and to ensure adjustments can be made up or down. Some homes in all phases may need to be lowered to an established height due to excessive frost heaving and ground subsidence. To be determined once contract has been awarded. Replace or Repair and properly insulate utility boxes. Repair water and sewer connections inside utility boxes and ensure proper slope and drainage. Level and repair entry steps and ramps including fill where needed. Repair electrical meter not to exceed 72" at the reader window. The Scope of Work (services) outlined under the terms of this Contract includes all necessary and required permits, labor, supervision, tools, equipment, materials and transportation (including travel expenses), for the work. All work required under this Contract shall be performed and completed as outlined in the Scope of Work.2

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents