Last Updated 11/10/2021 02:05 AM
Project Title

Reconstruction/Rehabilitation - Florence Co

Physical Address View project details and contacts
City, State (County) SC   (Florence County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds and Insurance 1.000 Ls Traffic Control 1.000 Ls Railroad Insurance and Flagging 001 1.000 Ls Removal & Disposal of Existing Pavement 7,930.000 Sy Removal & Disposal of Existing Curb 2,265.000 Lf Borrow Excavation 4,930.076 Cy Excavation for Shoulder Paving 397.056 Sta Hauling of Excavated Shoulder Material 397.056 Sta Cement Modified Recycled Base (12" Unif)-curing Method B 196,893.270 Sy Portland Cement for Cement Modified Recycled Base Course 5,811.590 Ton Maintenance Stone 216.350 Ton Hma Shoulder Widening Course 1,985.280 Ton Liquid Asphalt Binder Pg64-22 3,725.230 Ton Full Depth Asph. Pav. Patching 8" Unif 7,035.000 Sy Full Depth Asph. Pav. Patching 10"Unif 14,600.000 Sy Milling Existing Asphalt Pavement 2.0" 346,088.000 Sy Milling Existing Asphalt Pavement (Variable) 3,325.000 Sy Milled-in Rumble Strip 40.169 Mi Hot Mix Asphalt Surface Course Type B 50,910.826 Ton Hot Mix Asphalt Surface Course Type C 10,568.900 Ton Hot Mix Asphalt Surface Course Type D 670.000 Ton Driveway Paving-surface Type D 2,118.125 Ton Permanent Construction Signs (Ground Mounted) 8,790.000 Sf 4" White Broken Lines -(Gaps Excluded)-fast Dry Paint 108,540.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 623,841.000 Lf 8"White Solid Lines(Crosswalk&channelization)fast Dry Paint 20,255.000 Lf 24" White Solid Lines (Stop/diagonal Lines)-fast Dry Paint 10,020.000 Lf White Single Arrow (Left, Straight, Right)-fast Dry Paint 162.000 Ea White Word Message "Only"-fast Dry Paint 93.000 Ea White Combination Arrow(Str.& Rt.or Str.& Lt.)fast Dry Paint 60.000 Ea Railroad Crossing Symbols - Fast Dry Paint 18.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 81,585.000 Lf 4"Yellow Solid Line(Pvt.edge&no Passing Zone)-fast Dry Paint 535,506.000 Lf 6" Yellow Solid Line on Curb/median - Fast Dry Paint 4,250.000 Lf 24" Yellow Diagonal Lines - Fast Dry Paint 420.000 Lf 4" White Broken Lines -(Gaps Excluded) - Epoxy Paint 750.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Epoxy Paint 2,790.000 Lf 4" Yellow Broken Lines(Gaps Exc) Epoxy Paint 600.000 Lf 4"Yellow Solid Lines-pvt.edge&no Passing Zone - Epoxy Paint 4,310.000 Lf 4" White Broken Lines(Gaps Excl.)thermoplastic- 90 Mil. 36,180.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 207,947.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 6,245.000 Lf 12in X 18in White Triang. Yield Bar (Gaps Exc)thermo-125mil 70.000 Lf 24" White Solid Lines (Stop/diag Lines)-thermo.-125 Mil 3,340.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 54.000 Ea White Word Message "Only" -thermoplastic - 125 Mil. 31.000 Ea White Combination Arrows(Str&rt.or Str<)thermo-125mil 20.000 Ea Railroad Crossing Symbols - Thermoplastic - 125 Mil. 6.000 Ea 4" Yellow Broken Lines(Gaps Exc)thermoplastic - 90 Mil. 27,195.000 Lf 4" Yellow Solid Lines(Pvt.edge Lines) Thermo-90 Mil. 178,502.000 Lf Permanent Clear Pavement Markers- Mono-dir.- 4"X4" 1,221.000 Ea Permanent Yellow Pavement Markers Mono-dir.- 4"X 4" Perm. Yel. 701.000 Ea Permanent Yellow Pavement Markers Bi-dir.- 4"X4" 2,845.000 Ea Removal of Pavement Markings 71,834.000 Lf Furnish & Install 1.0" Schedule 80 Pvc Conduit 820.000 Lf Furnish & Install 2.0" Schedule 80 Pvc Conduit 810.000 Lf Furnish & Install 2.0" Schd 80 Pvc Conduit (Direction.bored) 660.000 Lf Furnish & Install No. 14 Copper Wire, 8 Conductor (Gray) 700.000 Lf Furnish & Instl No. 14 Copper Wire,1-conductor for Loop Wire 19,552.000 Lf Sawcut for Loop Detector 6,471.000 Lf F&i-13"X24"X18"D.elec.flush Undgrd.enclos-(Str.poly.conc.)hd 24.000 Ea Catch Basin T-17 (Convert C.b. Type 5) 33.000 Ea Catch Basin T-17 (Convert C.b. Type 6) 6.000 Ea Catch Basin T-18 (Convert C.b. Type 7) 5.000 Ea Concrete Curb and Gutter(1'-6") Vertical Face 650.000 Lf Concrete Curb and Gutter(2'-0") Vertical Face 635.000 Lf Concrete Curb and Gutter (2'-6") Vertical Face 770.000 Lf Concrete Curb and Gutter (3'-0") Vertical Face 170.000 Lf Concrete Sidewalk(4" Uniform) 2,290.000 Sy Detectable Warning Material 1,637.500 Sf Concrete Driveway(6" Uniform) 2,255.000 Sy Pedestrian Ramp Construction 3,275.000 Sy Premash Type T Tl3 Leading 50' 5.000 Ea Permanent Grassing for Non-permitted Resurfacing Projects 16.046 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents